Urban Regeneration and Brownfield Concept Planning

Turn a derelict or underused previously developed site into a deliverable regeneration concept: baseline diagnosis, options appraisal and a concept package that can survive planning review.

Catalogue status: PlannedProfessional review: Not yet reviewed

Written teaching content: available for review

Video lessons have not yet been recorded. Written teaching content may be available for review below.

Written teaching content only. This course is not yet available: it has not been professionally reviewed, no lesson is recorded, and enrolment, payment, certificates, downloads and protected access are all disabled.

Review Written Course Content

Reading only. This is not enrolment, booking, purchase, account access, a download or protected learning access.

  • Written content: Available for review
  • Video lessons: Not recorded
  • Professional review: Not yet completed
  • Enrolment: Not available
  • Payment: Disabled
  • Certificates: Disabled
  • Downloads: Disabled
  • Protected access: Disabled

Written course content

Client-style brief

A synthetic 9-hectare former engineering works on the edge of a town centre has stood vacant for eleven years. Ownership is split between three parties, an old fuel store and a disused rail siding sit within the site, and two previous schemes were withdrawn after the authority questioned viability and access. The brief is to produce a regeneration concept package that diagnoses the site honestly, tests options rather than asserting one, and sets out a phasing and delivery narrative that can survive planning review.

Professional scenario

Synthetic previously developed site of 9 hectares: three ownerships, a retained brick workshop of local interest, a culverted watercourse crossing the northern third, an adopted road on one boundary only, a disused rail siding, recorded historic fuel storage, and an adjoining residential terrace along the eastern edge.

Planning problem

Brownfield land stalls because the hard questions are deferred. Contamination indicators are treated as a later survey matter, assembly is assumed, abnormal costs are left out of the first capacity test, and a concept drawing is produced before anyone has established what the site can actually carry or who would build the first phase. The professional problem is disciplined diagnosis and options appraisal before design commitment.

Learning objectives

  • Diagnose a previously developed site from history, ownership, constraint and market evidence rather than assumption.
  • Record contamination and ground-condition indicators honestly and state what survey work each indicator triggers.
  • Test development capacity and land-use mix as options with stated trade-offs, not as a single predetermined answer.
  • Assemble a concept masterplan with a movement and public-realm framework that responds to the diagnosed constraints.
  • Write a phasing and delivery narrative that names enabling works, likely delivery routes and the assumptions each depends on.
  • Self-review the package against a planning-review checklist and record every correction made.

Modules and lessons

0 of 9 lessons open

  1. Module 1

    Module 1 — Baseline diagnosis and briefing

    Establish what the site is, who controls it, what it carries from its former use, and what the brief must therefore answer.

    Example data: Synthetic historic land-use sequence, synthetic ownership schedule for three parties, synthetic utility and culvert records, publicly licensed open mapping obtained lawfully by the learner, and Ideeplan-owned baseline appraisal and brief templates. All site material is synthetic training material.

    Module output: Brownfield baseline appraisal, constraints-and-opportunities plan and a written regeneration brief.

  2. Module 2

    Module 2 — Options and capacity testing

    Test what the site can carry, in more than one form, and record why one option is preferred.

    Example data: Synthetic capacity parameters, a synthetic access and servicing constraint set, an Ideeplan-owned capacity schedule template and an Ideeplan-owned options appraisal matrix. All figures are synthetic training figures.

    Module output: Three tested concept options, a capacity schedule and a completed appraisal matrix.

  3. Module 3

    Module 3 — Concept package and review readiness

    Assemble the preferred option into a package that a planning authority can review, and correct it before submission.

    Example data: Ideeplan-owned concept package structure, movement and public-realm framework template, phasing worksheet and planning-review checklist. All illustrative site material remains synthetic.

    Module output: Regeneration concept package with movement and public-realm framework, phasing and delivery narrative, and a completed self-review record.

Project brief

A synthetic 9-hectare former engineering works, vacant for eleven years, in three ownerships, with a retained workshop of local interest, a culverted watercourse, a disused rail siding and recorded historic fuel storage.

Your role: Regeneration lead producing the concept package for planning review.

Information available

  • Synthetic historic land-use sequence and utility records.
  • Synthetic ownership schedule for three parties, one unresolved.
  • Publicly licensed open mapping obtained lawfully by the learner.
  • Synthetic policy extract for previously developed land, with a stated status date.
  • Ideeplan-owned baseline, capacity, appraisal, phasing and review templates.

Required analysis

  • Historic land-use and ownership assembly diagnosis.
  • Contamination and ground-condition indicator register with triggered investigations.
  • Capacity testing with every deduction reasoned.
  • Three-option appraisal with weighted criteria and recorded trade-offs.
  • Phasing and dependency analysis for the preferred option.

Required outputs

  • Baseline appraisal and constraints-and-opportunities plan.
  • Written regeneration brief.
  • Capacity schedule and land-use mix schedules for three options.
  • Completed options appraisal matrix with rejection reasons.
  • Concept masterplan with movement and public-realm framework.
  • Phasing worksheet, delivery narrative and self-review correction log.

Presentation standard: Every plan titled, scaled and dated; every figure traceable to a stated source or labelled as an assumption; every constraint shown rather than described only in text; and no image presented as a survey result.

Marking criteria

  • Baseline honesty: Former uses, ownership status and contamination indicators are recorded with sources, and no indicator is stated as a confirmed condition.
  • Capacity reasoning: Every deduction from gross area is reasoned, and capacity is expressed as a range with its assumptions.
  • Options discipline: Three structurally different options are tested and every rejection reason is recorded.
  • Design response: Each element of the concept and public-realm framework traces back to a diagnosed constraint or opportunity.
  • Deliverability: Phasing names enabling works, the first deliverable phase and every dependency, without asserting unconfirmed funding.
  • Review readiness: The self-review is complete, corrections are logged, and assumptions requiring survey confirmation are labelled.

Quality-assurance checklist

  • Previous land uses and contamination indicators are recorded, not assumed away.
  • Ownership and assembly constraints are shown on a plan.
  • Every rejected option has a recorded reason.
  • Phasing names enabling infrastructure and who might deliver it.
  • The package states which figures are assumptions requiring survey confirmation.
  • All site material used is synthetic training material; no client file, confidential document or unreleased project drawing is used.
  • Contaminated-land regimes, remediation duties, permitted development rights, density and open-space standards, heritage designations, drainage and culvert consents, and consultation procedures differ by country and by authority and must be confirmed with the relevant authority before this method is applied to a real site.

Common mistakes and correction tasks

  • A final masterplan drawn before the options appraisal is complete. Correction: Set the drawing aside, complete the appraisal matrix, and redraw only after the preferred option and its rejection reasons are recorded.
  • A contamination indicator written as a confirmed ground condition. Correction: Restate it as an indicator, name its source, and record the investigation required to confirm or discount it.
  • Capacity quoted as a single number with no deductions shown. Correction: Rebuild the schedule showing gross area, each deduction with its reason, and a capacity range with assumptions.
  • An unresolved ownership treated as available land. Correction: Mark the parcel unresolved, test whether the first phase works without it, and record the dependency.
  • Phasing that starts with built development before enabling works. Correction: Re-sequence so remediation, assembly and enabling infrastructure precede the phases that depend on them.
  • Delivery language that implies secured funding. Correction: Rewrite as a possible delivery route, state that funding is unconfirmed, and list what would need to be secured.

Enrolment status

Enrolment is not currently available. This course is still undergoing content, media and professional review.

Register Interest is an expression of interest only. It works without an account, creates no enrolment, no reserved place and no payment order.

Protected lessons, approved videos and approved resource files are not accessible. No protected file URL, signed link or download entitlement is created.

Payments are disabled. No price, checkout, payment provider, payment order or paid-course claim exists in the Academy.

Outstanding before enrolment could open

  • Outstanding — Professional content review is complete
  • Outstanding — Required videos recorded, reviewed and approved, or the course approved as written-only
  • Outstanding — Required practical resources approved and available
  • Outstanding — Learner terms approved
  • Outstanding — Privacy and data-handling requirements approved
  • Outstanding — Course availability explicitly enabled by an authorised administrator
  • Outstanding — Payment and refund terms approved (paid courses)
  • Outstanding — Payment provider configuration complete (where payment is required)
  • Outstanding — Authentication email delivery configured and tested
  • Outstanding — Protected content access tested
  • Outstanding — Approved delivery and support process in place

Progress, assessment and certificates

Submission access is not currently available

Lesson and course progress tracking is not active. No progress record, completion percentage or completed lesson exists for any account, and no course can record progress until enrolment opens.

Practical assessments cannot be submitted. Submission access is not currently available: there is no active enrolment, no upload configuration and no authorised reviewer workflow in operation.

No assessment has been marked, reviewed, corrected or passed. Reviewer feedback, correction tasks and pass decisions are made by an authorised human reviewer and none exists.

No certificate is issued, approved or pending. A future Academy certificate would be a course-completion certificate only — not a professional licence, statutory qualification, accreditation or government-recognised award.

Certificate verification is disabled until a certificate is genuinely issued. No verification result is produced for any reference.

Assessment formats planned for the Academy

Written briefs, required deliverables and marking criteria are published inside the course content above for open review. None of them can be submitted or marked at present.

  • Practical planning task
  • GIS mapping exercise
  • Site-appraisal task
  • Feasibility assessment
  • CAD or drawing task
  • Revit coordination task
  • Planning-report task
  • Policy-assessment task
  • Transport or access analysis
  • Environmental or green-infrastructure exercise
  • Final course project

Outstanding before completion or a certificate could exist

  • Outstanding — Learner identity verified by an authorised member of staff
  • Outstanding — Learner holds a valid active or completed enrolment
  • Outstanding — All required lessons completed
  • Outstanding — All required practical assessments passed
  • Outstanding — A recorded assessment decision exists for every required task
  • Outstanding — All requested corrections completed
  • Outstanding — Course content professionally reviewed and signed off
  • Outstanding — Authorised reviewer has approved completion
  • Outstanding — Course certificate policy approved
  • Outstanding — Certificate wording approved by Ideeplan Consult
  • Outstanding — Course is officially available
  • Outstanding — Unique certificate numbering and a secure verification route configured

Practical project materials

Written project materials for this course: the project brief, the synthetic scenario, the schedules, checklists and worksheets a learner works through, and the marking and correction sheets used to review the result.

Synthetic training material authored by Ideeplan. Not a real site, not a client project, and not survey-verified. These materials are written content shown on this page. Downloadable files are not currently available, no worked example file has been produced, and no material here has been professionally reviewed or approved.

Practical resources

Resources for this course

13 resource records · 13 with a written preview · 0 with a file under preparation · Download access not yet enabled.

All demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult and is labelled as demonstration material. No confidential client file, personal information, private agency document or unreleased project drawing is used.

  • Practical project brief

    Sets the professional situation, the role the learner takes and what must be produced.

    Written preview available — downloadable file not yet available
    Resource type
    Brief
    Format
    Written brief shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — One brief governs the whole course: every lesson exercise contributes to the same final deliverable.
    Access
    No account required — written preview is public
    • A synthetic 9-hectare former engineering works, vacant for eleven years, in three ownerships, with a retained workshop of local interest, a culverted watercourse, a disused rail siding and recorded historic fuel storage.
    • Your role: Regeneration lead producing the concept package for planning review.
    • Available information: Synthetic historic land-use sequence and utility records.
    • Available information: Synthetic ownership schedule for three parties, one unresolved.
    • Available information: Publicly licensed open mapping obtained lawfully by the learner.
    • Available information: Synthetic policy extract for previously developed land, with a stated status date.
    • Available information: Ideeplan-owned baseline, capacity, appraisal, phasing and review templates.
    • Required analysis: Historic land-use and ownership assembly diagnosis.
    • Required analysis: Contamination and ground-condition indicator register with triggered investigations.
    • Required analysis: Capacity testing with every deduction reasoned.
    • Required analysis: Three-option appraisal with weighted criteria and recorded trade-offs.
    • Required analysis: Phasing and dependency analysis for the preferred option.

    Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.

  • Client-style instruction and problem statement

    Gives the learner the instruction as a practitioner would receive it, and names the problem to be solved.

    Written preview available — downloadable file not yet available
    Resource type
    Brief
    Format
    Written statement shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — Scenario framing applies to every lesson in the course.
    Access
    No account required — written preview is public
  • Module 1 learner worksheet — Module 1 — Baseline diagnosis and briefing

    Lists the practical steps the learner carries out in this module, in order.

    Written preview available — downloadable file not yet available
    Resource type
    Worksheet
    Format
    Written worksheet shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Brownfield baseline appraisal, constraints-and-opportunities plan and a written regeneration brief.
    Lessons supported
    3 — Supports the 3 lessons in module 1, which build one shared output.
    Access
    No account required — written preview is public
  • Module 2 learner worksheet — Module 2 — Options and capacity testing

    Lists the practical steps the learner carries out in this module, in order.

    Written preview available — downloadable file not yet available
    Resource type
    Worksheet
    Format
    Written worksheet shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Three tested concept options, a capacity schedule and a completed appraisal matrix.
    Lessons supported
    3 — Supports the 3 lessons in module 2, which build one shared output.
    Access
    No account required — written preview is public
  • Module 3 learner worksheet — Module 3 — Concept package and review readiness

    Lists the practical steps the learner carries out in this module, in order.

    Written preview available — downloadable file not yet available
    Resource type
    Worksheet
    Format
    Written worksheet shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Regeneration concept package with movement and public-realm framework, phasing and delivery narrative, and a completed self-review record.
    Lessons supported
    3 — Supports the 3 lessons in module 3, which build one shared output.
    Access
    No account required — written preview is public
  • Task checklist

    Confirms every required piece of work has been produced before submission.

    Written preview available — downloadable file not yet available
    Resource type
    Checklist
    Format
    Written checklist shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — A single task checklist tracks progress across all modules.
    Access
    No account required — written preview is public
  • Example data and drawing base

    Synthetic historic land-use sequence, synthetic ownership schedule for three parties, synthetic utility and culvert records, publicly licensed open mapping obtained lawfully by the learner, and Ideeplan-owned baseline appraisal and brief templates. All site material is synthetic training material. GIS exercises are planned around plain, checkable formats: CSV and clearly labelled local-grid JSON on the named grid IDP-LOCAL-GRID. GeoJSON is not used for local-grid training data because the format asserts WGS 84 degrees. No QGIS project file, GeoPackage or raster file is claimed.

    Written preview available — downloadable file not yet available
    Resource type
    GIS exercise pack
    Format
    CSV and local-grid JSON (planned) — no GeoJSON, QGIS project, GeoPackage or raster file is claimed
    Status
    Planned
    Data classification
    Synthetic demonstration data
    Licence or ownership
    Synthetic demonstration material prepared by Ideeplan Consult. No client file, personal information, private agency document or unreleased project drawing is used.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — One demonstration data base is used by every lesson so results stay comparable.
    Access
    No account required — written preview is public
  • Analysis and calculation template

    Structures the analysis so assumptions are visible and checkable. Any figures used in a template are teaching assumptions, not market evidence. Local costs, policies, standards and valuation assumptions must be independently confirmed before any of this is applied to a real project.

    Written preview available — downloadable file not yet available
    Resource type
    Suitability matrix
    Format
    CSV matrix (planned)
    Status
    Planned
    Data classification
    Synthetic demonstration data
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — The same analysis structure is completed progressively through the course.
    Access
    No account required — written preview is public
  • Final deliverable template

    Sets the expected structure and presentation standard for Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log..

    Written preview available — downloadable file not yet available
    Resource type
    Presentation template
    Format
    PDF layout guide (planned)
    Status
    Planned
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — The final deliverable draws on every module output.
    Access
    No account required — written preview is public
  • Quality-control checklist

    Professional checks to run before the work is treated as finished.

    Written preview available — downloadable file not yet available
    Resource type
    Checklist
    Format
    Written checklist shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — Quality control is applied to the whole submission, not to a single lesson.
    Access
    No account required — written preview is public
  • Marking and review rubric

    States what a satisfactory professional standard looks like for each criterion.

    Written preview available — downloadable file not yet available
    Resource type
    Marking rubric
    Format
    Written rubric shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — One rubric reviews the final deliverable produced across all modules.
    Access
    No account required — written preview is public
  • Correction-task sheet

    Common professional mistakes and the correction the learner practises.

    Written preview available — downloadable file not yet available
    Resource type
    Correction-task sheet
    Format
    Written task sheet shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — Correction tasks address mistakes that can appear anywhere in the course.
    Access
    No account required — written preview is public
  • Submission guidance

    How the finished work should be assembled and presented for professional review.

    Written preview available — downloadable file not yet available
    Resource type
    Checklist
    Format
    Written guidance shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Urban regeneration concept package: baseline appraisal, contamination indicator register, capacity schedule, options appraisal matrix, concept masterplan with movement and public-realm framework, phasing worksheet and delivery narrative, and a completed self-review correction log.
    Lessons supported
    9 — Submission guidance covers the single final deliverable.
    Access
    No account required — written preview is public

Media status

Video lessons for this course

Video lessons
Video lesson: Not recorded — authentic professional recording required.
Narration
Professional narration — planned, not produced
Captions
Not yet produced
Transcript
Not yet produced
Software demonstration
Genuine screen capture from the real application only — no mockup, simulated interface or AI-generated screen.
Software version and operating system
No software version is published until it has been read from the actual recorded session. Until then the version reads “To be stated from the recorded session”.
Production plan
Prepared for professional review
Enrolment, payment and downloads
Disabled

Video lesson: Not recorded — authentic professional recording required. The written lesson on this page is complete and can be read in full without a video, an account, enrolment or payment.

Authentic software screen capture only — non-negotiable standard

Applies to every software demonstrated in the Academy, including AutoCAD, QGIS, Revit, ArcGIS, SketchUp, Lumion, Civil 3D, Rhino and any other software used. The final video must accurately represent what a learner sees when using the stated software version.

  • Every demonstration is a genuine screen recording or screenshot captured from the actual installed software being taught.
  • The exact software name, version, operating system and relevant workspace are stated on screen and in the lesson notes, as read from the recorded session.
  • The real interface is shown: menus, panels, toolbars, properties, layer controls, settings and the command line or log.
  • The real cursor, tool selection, commands, settings and the resulting output are visible.
  • Capture is 16:9 and readable at 720p, with clear, unhurried cursor movement; the screen stays clear enough for learners to follow.
  • The view zooms in whenever text, settings, coordinates or field values would otherwise be hard to read.
  • The exact command, menu path or tool name is shown as it appears in the software.
  • Useful keyboard shortcuts are shown alongside the menu path, never instead of it.
  • Differences between software versions or operating systems are stated wherever the interface may display differently.
  • Steps are numbered on screen, with callouts pointing at the actual control being used.
  • Any annotation is added only after recording and must never alter or misrepresent the software interface.
  • Captions and a complete transcript are produced before professional review.
  • Any presenter window stays small, is positioned clear of technical content, and is hidden on mobile widths and on dense technical screens.

Interface visibility on every recording

  • The full application interface is shown at the beginning of every demonstration, with the application identity and exact version clearly visible.
  • The relevant menu bar, ribbon, toolbar or toolbox stays visible while each step is explained; the interface context is never cropped away.
  • Layers, properties, project browser or data panels are shown wherever applicable.
  • The command line, status bar or coordinate/CRS information is shown wherever relevant.
  • Real cursor movement and visible clicks are captured, with visible cursor highlighting or click indicators.
  • The selected tool and its effect are visible, and complete dialog boxes and settings are shown whenever one is opened.
  • The resulting drawing, map, model or output is shown in the recording.
  • Zoom is used only when necessary for small text or settings, always retaining enough context to identify the application and tool in use.
  • The standard applies to every software course and is verified before any video is marked recorded or approved; if the required authentic interface is not visible, the lesson remains “Video lesson: Not recorded — authentic professional recording required.”

Never used

  • Generic website mockups standing in for a software workspace.
  • Simulated, redrawn, reconstructed or redesigned replica interfaces for any software.
  • AI-generated software screens, panels, dialogs or map canvases.
  • Generic illustrations replacing the real interface.
  • Unverified screenshots taken from any source other than the recorded session.
  • Fake video players, placeholder thumbnails or invented durations.
  • Invented menus, tool names, command names, dialog options or keyboard shortcuts.
  • Hiding important controls or covering them with a presenter window.
  • Annotations that alter or misrepresent the recorded software interface.
  • Claiming or implying that a simulated screen is an authentic software demonstration.

AutoCAD — what the recording must show

Exact AutoCAD release to be stated from the recorded session. Operating system to be stated from the recorded session; ribbon layout and shortcuts differ between Windows and Mac.

  1. 1.Drawing setup: new drawing, template choice and workspace.
  2. 2.Units: the UNITS dialog, unit type, precision and insertion scale.
  3. 3.Layers: the Layer Properties Manager, layer creation, colour, linetype and lineweight.
  4. 4.Object properties: the Properties palette and how an object's layer and overrides are read.
  5. 5.Commands: the command line with the exact command typed, including options and prompts.
  6. 6.Dimensions: dimension style settings and a dimension placed on real geometry.
  7. 7.Layouts: layout tabs, sheet size and page setup.
  8. 8.Viewports: viewport creation, scale setting and viewport locking.
  9. 9.Title blocks: title block insertion and completion of the sheet fields.
  10. 10.Plot settings: the PLOT dialog, plot style, paper size, scale and preview.
  11. 11.Final drawing checks: audit, purge, layer check and a measured check against the plotted scale.

QGIS — what the recording must show

Exact QGIS version to be stated from the recorded session. Operating system to be stated from the recorded session; menu positions and file dialogs differ between systems.

  1. 1.Project CRS: Project Properties, the CRS tab and the selected coordinate reference system.
  2. 2.Layer loading: the Data Source Manager or Browser panel and the layer added to the canvas.
  3. 3.Layer properties: the Layer Properties dialog and each tab used in the lesson.
  4. 4.Symbology: the Symbology tab with the real renderer, classes and colour settings.
  5. 5.Attribute tables: the attribute table, field values, selection and expression use.
  6. 6.Processing tools: the Processing Toolbox with the tool searched and opened by its real name.
  7. 7.Analysis settings: every parameter in the tool dialog, including output location.
  8. 8.Map layout: the Print Layout window, page setup and map item.
  9. 9.Legend, scale and north arrow: each item added from the real layout toolbar.
  10. 10.Export and quality checks: the export dialog settings and a check of the exported file.

No authentic software recording or screenshot exists yet. Every software lesson remains “Video lesson: Not recorded — authentic professional recording required.”

Real professional classroom experience — every lesson

Applies to every future Academy lesson, software-based or not. The finished lesson presents as authentic professional training, professionally narrated and screen-led: video + written guide + supporting data + practical task + quality checklist + final named deliverable.

Lesson structure

  1. 1.Professional introduction.
  2. 2.Realistic project situation.
  3. 3.Learner role within that situation.
  4. 4.Problem statement.
  5. 5.Learning objectives.
  6. 6.Required software and data.
  7. 7.Step-by-step demonstration.
  8. 8.Explanation of the professional reasoning behind each action.
  9. 9.Practical learner task.
  10. 10.Checkpoint or pause activity.
  11. 11.Common mistake and its correction.
  12. 12.Quality-control review.
  13. 13.Final recap.
  14. 14.Named learner deliverable.

Video requirements

  • Professional narration that is clear, natural and paced for instruction, synchronised with the screen action.
  • Authentic screen recording from the actual software, with visible menus, tools, panels, commands, settings and outputs.
  • Natural cursor movement and deliberate pacing, with a clear explanation of why each action is taken.
  • Realistic corrections and troubleshooting shown, not edited away.
  • Clear 16:9 screen capture.
  • Captions and a complete transcript.
  • Chapter titles and lesson sections.
  • A small presenter window only where useful; it never covers technical content and is hidden on mobile or dense technical screens.

Never produced as a lesson

  • Automated slideshows.
  • Generic screen tours.
  • Silent software demonstrations.
  • Marketing videos presented as lessons.
  • AI-avatar presentations.
  • Simulated software tutorials.
  • Fast montages without explanation.
  • An invented tutor, instructor identity, voice, recording, thumbnail or completion status.

Lessons use only synthetic, publicly licensed or Ideeplan-owned examples. No confidential client information is used.

No genuine professional recording exists yet. Until one does, every lesson remains “Video lesson: Not recorded — authentic professional recording required.” Enrolment, payments, certificates and protected learner access stay disabled during this production stage.

Professional narration and screen-first production

  • Every Academy lesson is planned as a professionally narrated, screen-led practical lesson with captions and a complete transcript.
  • No AI avatar, virtual presenter or artificial talking head is used, and no named person is imitated. No lesson is described as human-narrated, instructor-led by a named person or personally presented unless that is factually true.
  • No instructor identity is published until a real, named professional has recorded and approved the lesson.
  • Recordings are screen-first: the GIS view, planning drawing, AutoCAD or Revit workspace or document remains the main subject of the frame.
  • Any presenter picture-in-picture normally occupies about 8–10% of the frame, never covers technical content, and is reduced or hidden on small screens.
  • The Principal Consultant portrait is reserved for approved introductions and conclusions. It is never used as a repeated course thumbnail, and the Academy remains company-first.

No lesson has been recorded and no narration has been produced. Scripts exist as production plans only, and every lesson video status remains “Not recorded”.

Demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult. No confidential client file, unauthorised agency dataset or private project information is used.

Methods are jurisdiction-neutral. Learners must confirm local laws, policies and technical standards before applying them to a real project.

A production plan describes how a lesson would be recorded. It is not a recording, and it does not create an enrolment, account, payment or reserved place.

Course production standard

  • Recordings are screen-first: the planning drawing, GIS view, AutoCAD or Revit workspace stays the main subject of the frame.
  • Any presenter picture-in-picture normally occupies no more than about 8–10% of the frame and never covers maps, legends, drawings, dimensions or annotations.
  • On mobile and on dense technical screens the presenter window is reduced further or hidden entirely.
  • The Principal Consultant portrait is reserved for approved introductions, explanations and conclusions. It is not used as a generic thumbnail for every course.
  • Narration is planned for professional human delivery. No AI narration, AI presenter or recorded lesson exists today.

No lesson has been recorded. Every lesson media status is “Not recorded”.

Any example data used in teaching is synthetic, publicly licensed or owned by Ideeplan Consult, and is clearly labelled as demonstration data. No client file, confidential document or unauthorised project material is used.

Want this course finished first?

Registering interest is not an enrolment. It tells Ideeplan Consult which subjects to complete and review first.

Discuss a Project