Applied professional course
Transport–Land Use Integration
Plan land use and movement together: density around access, corridor structure and the trip consequences of allocation decisions.
Written teaching content: available for review
Video lessons have not yet been recorded. Written teaching content may be available for review below.
Written teaching content only. This course is not yet available: it has not been professionally reviewed, no lesson is recorded, and enrolment, payment, certificates, downloads and protected access are all disabled.
Review Written Course ContentReading only. This is not enrolment, booking, purchase, account access, a download or protected learning access.
- Written content: Available for review
- Video lessons: Not recorded
- Professional review: Not yet completed
- Enrolment: Not available
- Payment: Disabled
- Certificates: Disabled
- Downloads: Disabled
- Protected access: Disabled
Written course content
Client-style brief
A local authority is preparing a growth strategy and must decide where 6,000 new homes and two employment areas should go across a corridor of five settlements. Earlier allocations were made on land availability alone and have produced car-dependent development with failing junctions. The brief is to test allocation options against accessibility and network capacity and to recommend a distribution.
Professional scenario
Synthetic 24-kilometre corridor with five settlements, one rail line with three stations, a primary road with four constrained junctions, public census-style population data and a synthetic land availability register of eighteen sites.
Planning problem
Land use and transport are decided by different teams on different timetables, so allocations arrive after the network assumptions are fixed. The result is growth that generates trips the network cannot absorb and journeys that can only be made by car. The professional problem is to make accessibility a location criterion rather than a consequence.
Learning objectives
- Build an accessibility baseline for a corridor from public and synthetic data.
- Relate land-use quantum and type to trip generation in transparent terms.
- Construct and test allocation options against accessibility and network constraint.
- Identify the infrastructure interventions each option depends on.
- Write a defensible distribution recommendation with stated uncertainty.
Modules and lessons
0 of 9 lessons open
Module 1
Module 1 — Corridor accessibility baseline
Establish where people can already reach things, and how.
Setting a study corridor from travel patterns rather than administrative lines, identifying settlement roles and interdependence, mapping key destinations, and stating what the baseline does and does not cover.
Practical exercise: Define the corridor extent and map settlements, stations, employment areas and key services.
Checkpoint: The corridor boundary is justified in writing by function, not convenience.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Distance and time thresholds, walk and cycle catchments around stations and centres, service frequency as an accessibility variable, and building a transparent scoring framework whose weights are visible.
Practical exercise: Score each settlement against the accessibility framework and record every weight and threshold used.
Checkpoint: Another analyst could reproduce every score from the recorded method.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Identifying constrained junctions and links, reading synthetic count and delay data, distinguishing a capacity constraint from a safety or severance constraint, and mapping constraint alongside accessibility.
Practical exercise: Map the four constrained junctions with their recorded issues and overlay them on the accessibility map.
Checkpoint: Each constraint is classified by type and evidenced from the supplied data.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Public census-style population and employment data, synthetic timetable extracts for the rail line and two bus routes, road network data and an Ideeplan-owned accessibility scoring framework.
Module output: Corridor accessibility baseline with settlement scores and a mapped summary.
Module 2
Module 2 — Land use, trips and options
Convert allocation choices into transport consequences.
Relating homes and floorspace to trips, peak-hour versus daily figures, the assumptions that dominate the result, sensitivity to mode share, and stating trip figures as ranges rather than false precision.
Practical exercise: Build the trip generation sheet for the full growth target with every assumption on the face of the workbook.
Checkpoint: Changing one assumption visibly changes the outputs with no hidden constants.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Constructing options that express genuinely different strategies rather than variations of one, concentration versus dispersal versus station-focused growth, respecting site capacity, and keeping the growth total constant across options.
Practical exercise: Build three allocation options from the site register that each deliver the full growth target.
Checkpoint: All three options deliver the same quantum and are strategically distinct.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Assigning growth to accessibility bands, estimating mode share by location, loading trips onto constrained junctions in simple terms, and comparing options on a consistent set of indicators.
Practical exercise: Score all three options against accessibility bands and constrained junction loading.
Checkpoint: The comparison table uses identical indicators and units for every option.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Synthetic land availability register of eighteen sites, Ideeplan-owned trip rate assumptions and a synthetic growth target of 6,000 homes and two employment areas.
Module output: Three allocation options with trip and mode assumptions recorded.
Module 3
Module 3 — Infrastructure, deliverability and recommendation
Say what each option requires and which one to pursue.
Identifying the interventions an option cannot proceed without, distinguishing enabling from mitigating infrastructure, sequencing growth against delivery, and the risk of allocating growth ahead of committed infrastructure.
Practical exercise: Produce the dependency schedule for each option, marking enabling interventions and phase triggers.
Checkpoint: Each option states the infrastructure required before first occupation and at each phase.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Multi-criteria comparison without hiding the weighting, testing conclusions against changed mode-share and delivery assumptions, identifying which conclusions are robust, and describing residual uncertainty honestly.
Practical exercise: Run two sensitivity tests and record which conclusions survive both.
Checkpoint: The recommendation identifies which findings are robust and which are assumption-dependent.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Structuring an advice note for members and officers, separating evidence from judgement, making the recommendation actionable in policy terms, and stating the further work needed before adoption.
Practical exercise: Write the distribution recommendation with evidence, judgement and further work clearly separated.
Checkpoint: A reader can identify which sentences are evidence and which are professional judgement.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Synthetic infrastructure cost bands, Ideeplan-owned deliverability criteria and a synthetic policy framework extract.
Module output: Distribution recommendation with an infrastructure dependency schedule.
Project brief
A synthetic 24-kilometre corridor of five settlements with a growth target of 6,000 homes and two employment areas.
Your role: Planning and transport analyst advising on growth distribution.
Information available
- Public census-style population and employment data.
- Synthetic timetable, count and junction delay data.
- Synthetic land availability register of eighteen sites.
- Ideeplan-owned accessibility framework, trip assumptions and deliverability criteria.
Required analysis
- Accessibility scoring for all five settlements.
- Constraint classification for four junctions.
- Trip generation for the full growth target with visible assumptions.
- Comparative testing of three allocation options and two sensitivity tests.
Required outputs
- Accessibility baseline map and score table.
- Three allocation options at equal quantum.
- Comparison table on consistent indicators.
- Infrastructure dependency and phasing schedule.
- Written recommendation with uncertainty stated.
Presentation standard: Every map titled, scaled and sourced; every numeric assumption visible in the workbook; and no conclusion stated more firmly than its evidence allows.
Marking criteria
- Baseline rigour: Accessibility scoring is reproducible from the recorded method and data.
- Transparency of assumptions: Trip and mode assumptions are visible, sourced and adjustable.
- Option quality: Options are strategically distinct and deliver equal growth.
- Infrastructure realism: Enabling infrastructure and phase triggers are identified for each option.
- Defensibility: Evidence, judgement and residual uncertainty are separated in the written advice.
Quality-assurance checklist
- Every accessibility threshold and weight is recorded and applied consistently.
- All three options deliver the same growth quantum.
- Trip figures are presented as ranges with assumptions stated.
- No junction conclusion is drawn beyond what the supplied data supports.
- Local plan-making procedures, transport assessment thresholds, trip rate conventions and infrastructure funding rules are confirmed with the relevant authority before the method is applied to a real strategy.
Common mistakes and correction tasks
- Accessibility scored with undocumented weights. Correction: Publish the weighting table and re-run the scoring so results are reproducible.
- Options with different total growth compared as equals. Correction: Rebalance every option to the same quantum before comparison.
- Trip generation quoted to a single figure with no range. Correction: Present a range with the mode-share assumptions that produce each end.
- Infrastructure listed without saying which growth it unlocks. Correction: Link each intervention to the phase and quantum it enables.
- A judgement written as if it were a data finding. Correction: Move it into the judgement section and state the reasoning behind it.
Enrolment status
Enrolment is not currently available. This course is still undergoing content, media and professional review.
Register Interest is an expression of interest only. It works without an account, creates no enrolment, no reserved place and no payment order.
Protected lessons, approved videos and approved resource files are not accessible. No protected file URL, signed link or download entitlement is created.
Payments are disabled. No price, checkout, payment provider, payment order or paid-course claim exists in the Academy.
Outstanding before enrolment could open
- Outstanding — Professional content review is complete
- Outstanding — Required videos recorded, reviewed and approved, or the course approved as written-only
- Outstanding — Required practical resources approved and available
- Outstanding — Learner terms approved
- Outstanding — Privacy and data-handling requirements approved
- Outstanding — Course availability explicitly enabled by an authorised administrator
- Outstanding — Payment and refund terms approved (paid courses)
- Outstanding — Payment provider configuration complete (where payment is required)
- Outstanding — Authentication email delivery configured and tested
- Outstanding — Protected content access tested
- Outstanding — Approved delivery and support process in place
Progress, assessment and certificates
Submission access is not currently available
Lesson and course progress tracking is not active. No progress record, completion percentage or completed lesson exists for any account, and no course can record progress until enrolment opens.
Practical assessments cannot be submitted. Submission access is not currently available: there is no active enrolment, no upload configuration and no authorised reviewer workflow in operation.
No assessment has been marked, reviewed, corrected or passed. Reviewer feedback, correction tasks and pass decisions are made by an authorised human reviewer and none exists.
No certificate is issued, approved or pending. A future Academy certificate would be a course-completion certificate only — not a professional licence, statutory qualification, accreditation or government-recognised award.
Certificate verification is disabled until a certificate is genuinely issued. No verification result is produced for any reference.
Assessment formats planned for the Academy
Written briefs, required deliverables and marking criteria are published inside the course content above for open review. None of them can be submitted or marked at present.
- Practical planning task
- GIS mapping exercise
- Site-appraisal task
- Feasibility assessment
- CAD or drawing task
- Revit coordination task
- Planning-report task
- Policy-assessment task
- Transport or access analysis
- Environmental or green-infrastructure exercise
- Final course project
Outstanding before completion or a certificate could exist
- Outstanding — Learner identity verified by an authorised member of staff
- Outstanding — Learner holds a valid active or completed enrolment
- Outstanding — All required lessons completed
- Outstanding — All required practical assessments passed
- Outstanding — A recorded assessment decision exists for every required task
- Outstanding — All requested corrections completed
- Outstanding — Course content professionally reviewed and signed off
- Outstanding — Authorised reviewer has approved completion
- Outstanding — Course certificate policy approved
- Outstanding — Certificate wording approved by Ideeplan Consult
- Outstanding — Course is officially available
- Outstanding — Unique certificate numbering and a secure verification route configured
Practical resources
Resources for this course
13 resource records · 13 with a written preview · 0 with a file under preparation · Download access not yet enabled.
All demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult and is labelled as demonstration material. No confidential client file, personal information, private agency document or unreleased project drawing is used.
- Written preview available — downloadable file not yet available
Practical project brief
Sets the professional situation, the role the learner takes and what must be produced.
- Resource type
- Brief
- Format
- Written brief shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — One brief governs the whole course: every lesson exercise contributes to the same final deliverable.
- Access
- No account required — written preview is public
- A synthetic 24-kilometre corridor of five settlements with a growth target of 6,000 homes and two employment areas.
- Your role: Planning and transport analyst advising on growth distribution.
- Available information: Public census-style population and employment data.
- Available information: Synthetic timetable, count and junction delay data.
- Available information: Synthetic land availability register of eighteen sites.
- Available information: Ideeplan-owned accessibility framework, trip assumptions and deliverability criteria.
- Required analysis: Accessibility scoring for all five settlements.
- Required analysis: Constraint classification for four junctions.
- Required analysis: Trip generation for the full growth target with visible assumptions.
- Required analysis: Comparative testing of three allocation options and two sensitivity tests.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Client-style instruction and problem statement
Gives the learner the instruction as a practitioner would receive it, and names the problem to be solved.
- Resource type
- Brief
- Format
- Written statement shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — Scenario framing applies to every lesson in the course.
- Access
- No account required — written preview is public
Synthetic 24-kilometre corridor with five settlements, one rail line with three stations, a primary road with four constrained junctions, public census-style population data and a synthetic land availability register of eighteen sites.
Land use and transport are decided by different teams on different timetables, so allocations arrive after the network assumptions are fixed. The result is growth that generates trips the network cannot absorb and journeys that can only be made by car. The professional problem is to make accessibility a location criterion rather than a consequence.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 1 learner worksheet — Module 1 — Corridor accessibility baseline
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor accessibility baseline with settlement scores and a mapped summary.
- Lessons supported
- 3 — Supports the 3 lessons in module 1, which build one shared output.
- Access
- No account required — written preview is public
- Defining the corridor and its functional geography — Define the corridor extent and map settlements, stations, employment areas and key services.
- Measuring accessibility consistently — Score each settlement against the accessibility framework and record every weight and threshold used.
- Network constraint and current performance — Map the four constrained junctions with their recorded issues and overlay them on the accessibility map.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 2 learner worksheet — Module 2 — Land use, trips and options
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Three allocation options with trip and mode assumptions recorded.
- Lessons supported
- 3 — Supports the 3 lessons in module 2, which build one shared output.
- Access
- No account required — written preview is public
- Trip generation in transparent terms — Build the trip generation sheet for the full growth target with every assumption on the face of the workbook.
- Building allocation options — Build three allocation options from the site register that each deliver the full growth target.
- Testing options against accessibility and constraint — Score all three options against accessibility bands and constrained junction loading.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 3 learner worksheet — Module 3 — Infrastructure, deliverability and recommendation
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Distribution recommendation with an infrastructure dependency schedule.
- Lessons supported
- 3 — Supports the 3 lessons in module 3, which build one shared output.
- Access
- No account required — written preview is public
- Infrastructure dependency and phasing — Produce the dependency schedule for each option, marking enabling interventions and phase triggers.
- Comparing options and handling uncertainty — Run two sensitivity tests and record which conclusions survive both.
- Writing the recommendation — Write the distribution recommendation with evidence, judgement and further work clearly separated.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Task checklist
Confirms every required piece of work has been produced before submission.
- Resource type
- Checklist
- Format
- Written checklist shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — A single task checklist tracks progress across all modules.
- Access
- No account required — written preview is public
- Accessibility baseline map and score table.
- Three allocation options at equal quantum.
- Comparison table on consistent indicators.
- Infrastructure dependency and phasing schedule.
- Written recommendation with uncertainty stated.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Example data and drawing base
Public census-style population and employment data, synthetic timetable extracts for the rail line and two bus routes, road network data and an Ideeplan-owned accessibility scoring framework. GIS exercises are planned around plain, checkable formats: CSV and clearly labelled local-grid JSON on the named grid IDP-LOCAL-GRID. GeoJSON is not used for local-grid training data because the format asserts WGS 84 degrees. No QGIS project file, GeoPackage or raster file is claimed.
- Resource type
- GIS exercise pack
- Format
- CSV and local-grid JSON (planned) — no GeoJSON, QGIS project, GeoPackage or raster file is claimed
- Status
- Planned
- Data classification
- Synthetic demonstration data
- Licence or ownership
- Synthetic demonstration material prepared by Ideeplan Consult. No client file, personal information, private agency document or unreleased project drawing is used.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — One demonstration data base is used by every lesson so results stay comparable.
- Access
- No account required — written preview is public
Demonstration data item What it contains and how it is used Data ownership and licence Synthetic training data prepared and owned by Ideeplan Consult. It is fictional: it is not a real client project, a real site or a real location, and it must not be presented as one. Free to study on this page; redistribution is not permitted. Module 1 input — Module 1 — Corridor accessibility baseline Public census-style population and employment data, synthetic timetable extracts for the rail line and two bus routes, road network data and an Ideeplan-owned accessibility scoring framework. Module 2 input — Module 2 — Land use, trips and options Synthetic land availability register of eighteen sites, Ideeplan-owned trip rate assumptions and a synthetic growth target of 6,000 homes and two employment areas. Module 3 input — Module 3 — Infrastructure, deliverability and recommendation Synthetic infrastructure cost bands, Ideeplan-owned deliverability criteria and a synthetic policy framework extract. Lawful sourcing where real data is substituted Where a learner substitutes real data, use only openly licensed or lawfully obtained sources, record the publisher, dataset title, version and access date, and cite them in the final deliverable. Do not use restricted, confidential or personal data. Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Analysis and calculation template
Structures the analysis so assumptions are visible and checkable. Any figures used in a template are teaching assumptions, not market evidence. Local costs, policies, standards and valuation assumptions must be independently confirmed before any of this is applied to a real project.
- Resource type
- Suitability matrix
- Format
- CSV matrix (planned)
- Status
- Planned
- Data classification
- Synthetic demonstration data
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — The same analysis structure is completed progressively through the course.
- Access
- No account required — written preview is public
- Record every assumption on its own labelled row, with the source or reason beside it.
- Module 1 working section — Corridor accessibility baseline with settlement scores and a mapped summary.
- Module 2 working section — Three allocation options with trip and mode assumptions recorded.
- Module 3 working section — Distribution recommendation with an infrastructure dependency schedule.
- Required output carried into the analysis — Accessibility baseline map and score table.
- Required output carried into the analysis — Three allocation options at equal quantum.
- Required output carried into the analysis — Comparison table on consistent indicators.
- Required output carried into the analysis — Infrastructure dependency and phasing schedule.
- Required output carried into the analysis — Written recommendation with uncertainty stated.
- Check row: totals, units and areas reconcile before the result is carried into the deliverable.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Final deliverable template
Sets the expected structure and presentation standard for Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule.
- Resource type
- Planning-report template
- Format
- Structured document outline (planned)
- Status
- Planned
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — The final deliverable draws on every module output.
- Access
- No account required — written preview is public
- Final named deliverable — Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Section 1 — Corridor accessibility baseline with settlement scores and a mapped summary.
- Section 2 — Three allocation options with trip and mode assumptions recorded.
- Section 3 — Distribution recommendation with an infrastructure dependency schedule.
- Must be present — Accessibility baseline map and score table.
- Must be present — Three allocation options at equal quantum.
- Must be present — Comparison table on consistent indicators.
- Must be present — Infrastructure dependency and phasing schedule.
- Must be present — Written recommendation with uncertainty stated.
- Presentation and submission standard — Every map titled, scaled and sourced; every numeric assumption visible in the workbook; and no conclusion stated more firmly than its evidence allows.
- Sources and citations: list every dataset, publisher, version and access date used, and state clearly where synthetic Ideeplan training data was used.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Quality-control checklist
Professional checks to run before the work is treated as finished.
- Resource type
- Checklist
- Format
- Written checklist shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — Quality control is applied to the whole submission, not to a single lesson.
- Access
- No account required — written preview is public
- Every accessibility threshold and weight is recorded and applied consistently.
- All three options deliver the same growth quantum.
- Trip figures are presented as ranges with assumptions stated.
- No junction conclusion is drawn beyond what the supplied data supports.
- Local plan-making procedures, transport assessment thresholds, trip rate conventions and infrastructure funding rules are confirmed with the relevant authority before the method is applied to a real strategy.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Marking and review rubric
States what a satisfactory professional standard looks like for each criterion.
- Resource type
- Marking rubric
- Format
- Written rubric shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — One rubric reviews the final deliverable produced across all modules.
- Access
- No account required — written preview is public
Criterion Satisfactory standard Baseline rigour Accessibility scoring is reproducible from the recorded method and data. Transparency of assumptions Trip and mode assumptions are visible, sourced and adjustable. Option quality Options are strategically distinct and deliver equal growth. Infrastructure realism Enabling infrastructure and phase triggers are identified for each option. Defensibility Evidence, judgement and residual uncertainty are separated in the written advice. Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Correction-task sheet
Common professional mistakes and the correction the learner practises.
- Resource type
- Correction-task sheet
- Format
- Written task sheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — Correction tasks address mistakes that can appear anywhere in the course.
- Access
- No account required — written preview is public
- Accessibility scored with undocumented weights. — Publish the weighting table and re-run the scoring so results are reproducible.
- Options with different total growth compared as equals. — Rebalance every option to the same quantum before comparison.
- Trip generation quoted to a single figure with no range. — Present a range with the mode-share assumptions that produce each end.
- Infrastructure listed without saying which growth it unlocks. — Link each intervention to the phase and quantum it enables.
- A judgement written as if it were a data finding. — Move it into the judgement section and state the reasoning behind it.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Submission guidance
How the finished work should be assembled and presented for professional review.
- Resource type
- Checklist
- Format
- Written guidance shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor Growth Distribution Advice Note with accessibility baseline, tested options and infrastructure dependency schedule
- Lessons supported
- 9 — Submission guidance covers the single final deliverable.
- Access
- No account required — written preview is public
Every map titled, scaled and sourced; every numeric assumption visible in the workbook; and no conclusion stated more firmly than its evidence allows.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
Media status
Video lessons for this course
- Video lessons
- Video lesson: Not recorded — authentic professional recording required.
- Narration
- Professional narration — planned, not produced
- Captions
- Not yet produced
- Transcript
- Not yet produced
- Software demonstration
- Genuine screen capture from the real application only — no mockup, simulated interface or AI-generated screen.
- Software version and operating system
- No software version is published until it has been read from the actual recorded session. Until then the version reads “To be stated from the recorded session”.
- Production plan
- Prepared for professional review
- Enrolment, payment and downloads
- Disabled
Video lesson: Not recorded — authentic professional recording required. The written lesson on this page is complete and can be read in full without a video, an account, enrolment or payment.
Authentic software screen capture only — non-negotiable standard
Applies to every software demonstrated in the Academy, including AutoCAD, QGIS, Revit, ArcGIS, SketchUp, Lumion, Civil 3D, Rhino and any other software used. The final video must accurately represent what a learner sees when using the stated software version.
- Every demonstration is a genuine screen recording or screenshot captured from the actual installed software being taught.
- The exact software name, version, operating system and relevant workspace are stated on screen and in the lesson notes, as read from the recorded session.
- The real interface is shown: menus, panels, toolbars, properties, layer controls, settings and the command line or log.
- The real cursor, tool selection, commands, settings and the resulting output are visible.
- Capture is 16:9 and readable at 720p, with clear, unhurried cursor movement; the screen stays clear enough for learners to follow.
- The view zooms in whenever text, settings, coordinates or field values would otherwise be hard to read.
- The exact command, menu path or tool name is shown as it appears in the software.
- Useful keyboard shortcuts are shown alongside the menu path, never instead of it.
- Differences between software versions or operating systems are stated wherever the interface may display differently.
- Steps are numbered on screen, with callouts pointing at the actual control being used.
- Any annotation is added only after recording and must never alter or misrepresent the software interface.
- Captions and a complete transcript are produced before professional review.
- Any presenter window stays small, is positioned clear of technical content, and is hidden on mobile widths and on dense technical screens.
Interface visibility on every recording
- The full application interface is shown at the beginning of every demonstration, with the application identity and exact version clearly visible.
- The relevant menu bar, ribbon, toolbar or toolbox stays visible while each step is explained; the interface context is never cropped away.
- Layers, properties, project browser or data panels are shown wherever applicable.
- The command line, status bar or coordinate/CRS information is shown wherever relevant.
- Real cursor movement and visible clicks are captured, with visible cursor highlighting or click indicators.
- The selected tool and its effect are visible, and complete dialog boxes and settings are shown whenever one is opened.
- The resulting drawing, map, model or output is shown in the recording.
- Zoom is used only when necessary for small text or settings, always retaining enough context to identify the application and tool in use.
- The standard applies to every software course and is verified before any video is marked recorded or approved; if the required authentic interface is not visible, the lesson remains “Video lesson: Not recorded — authentic professional recording required.”
Never used
- Generic website mockups standing in for a software workspace.
- Simulated, redrawn, reconstructed or redesigned replica interfaces for any software.
- AI-generated software screens, panels, dialogs or map canvases.
- Generic illustrations replacing the real interface.
- Unverified screenshots taken from any source other than the recorded session.
- Fake video players, placeholder thumbnails or invented durations.
- Invented menus, tool names, command names, dialog options or keyboard shortcuts.
- Hiding important controls or covering them with a presenter window.
- Annotations that alter or misrepresent the recorded software interface.
- Claiming or implying that a simulated screen is an authentic software demonstration.
QGIS — what the recording must show
Exact QGIS version to be stated from the recorded session. Operating system to be stated from the recorded session; menu positions and file dialogs differ between systems.
- 1.Project CRS: Project Properties, the CRS tab and the selected coordinate reference system.
- 2.Layer loading: the Data Source Manager or Browser panel and the layer added to the canvas.
- 3.Layer properties: the Layer Properties dialog and each tab used in the lesson.
- 4.Symbology: the Symbology tab with the real renderer, classes and colour settings.
- 5.Attribute tables: the attribute table, field values, selection and expression use.
- 6.Processing tools: the Processing Toolbox with the tool searched and opened by its real name.
- 7.Analysis settings: every parameter in the tool dialog, including output location.
- 8.Map layout: the Print Layout window, page setup and map item.
- 9.Legend, scale and north arrow: each item added from the real layout toolbar.
- 10.Export and quality checks: the export dialog settings and a check of the exported file.
No authentic software recording or screenshot exists yet. Every software lesson remains “Video lesson: Not recorded — authentic professional recording required.”
Real professional classroom experience — every lesson
Applies to every future Academy lesson, software-based or not. The finished lesson presents as authentic professional training, professionally narrated and screen-led: video + written guide + supporting data + practical task + quality checklist + final named deliverable.
Lesson structure
- 1.Professional introduction.
- 2.Realistic project situation.
- 3.Learner role within that situation.
- 4.Problem statement.
- 5.Learning objectives.
- 6.Required software and data.
- 7.Step-by-step demonstration.
- 8.Explanation of the professional reasoning behind each action.
- 9.Practical learner task.
- 10.Checkpoint or pause activity.
- 11.Common mistake and its correction.
- 12.Quality-control review.
- 13.Final recap.
- 14.Named learner deliverable.
Video requirements
- Professional narration that is clear, natural and paced for instruction, synchronised with the screen action.
- Authentic screen recording from the actual software, with visible menus, tools, panels, commands, settings and outputs.
- Natural cursor movement and deliberate pacing, with a clear explanation of why each action is taken.
- Realistic corrections and troubleshooting shown, not edited away.
- Clear 16:9 screen capture.
- Captions and a complete transcript.
- Chapter titles and lesson sections.
- A small presenter window only where useful; it never covers technical content and is hidden on mobile or dense technical screens.
Never produced as a lesson
- Automated slideshows.
- Generic screen tours.
- Silent software demonstrations.
- Marketing videos presented as lessons.
- AI-avatar presentations.
- Simulated software tutorials.
- Fast montages without explanation.
- An invented tutor, instructor identity, voice, recording, thumbnail or completion status.
Lessons use only synthetic, publicly licensed or Ideeplan-owned examples. No confidential client information is used.
No genuine professional recording exists yet. Until one does, every lesson remains “Video lesson: Not recorded — authentic professional recording required.” Enrolment, payments, certificates and protected learner access stay disabled during this production stage.
Professional narration and screen-first production
- Every Academy lesson is planned as a professionally narrated, screen-led practical lesson with captions and a complete transcript.
- No AI avatar, virtual presenter or artificial talking head is used, and no named person is imitated. No lesson is described as human-narrated, instructor-led by a named person or personally presented unless that is factually true.
- No instructor identity is published until a real, named professional has recorded and approved the lesson.
- Recordings are screen-first: the GIS view, planning drawing, AutoCAD or Revit workspace or document remains the main subject of the frame.
- Any presenter picture-in-picture normally occupies about 8–10% of the frame, never covers technical content, and is reduced or hidden on small screens.
- The Principal Consultant portrait is reserved for approved introductions and conclusions. It is never used as a repeated course thumbnail, and the Academy remains company-first.
No lesson has been recorded and no narration has been produced. Scripts exist as production plans only, and every lesson video status remains “Not recorded”.
Demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult. No confidential client file, unauthorised agency dataset or private project information is used.
Methods are jurisdiction-neutral. Learners must confirm local laws, policies and technical standards before applying them to a real project.
A production plan describes how a lesson would be recorded. It is not a recording, and it does not create an enrolment, account, payment or reserved place.
9 lesson production plans · suggested recording time about 90 minutes in total (a planning estimate, not a recorded duration) · every lesson video status: Not recorded.
Lesson 1 · Video lesson: Not recorded — authentic professional recording required.
Defining the corridor and its functional geography
- Learning objective
- Setting a study corridor from travel patterns rather than administrative lines, identifying settlement roles and interdependence, mapping key destinations, and stating what the baseline does and does not cover.
- Narration focus
- Establish where people can already reach things, and how.
- Screen action
- Define the corridor extent and map settlements, stations, employment areas and key services.
- Required software
- QGIS, Spreadsheet software, Word processing software
- Example data
- Public census-style population and employment data, synthetic timetable extracts for the rail line and two bus routes, road network data and an Ideeplan-owned accessibility scoring framework.
- Expected learner output
- The corridor boundary is justified in writing by function, not convenience.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Setting a study corridor from travel patterns rather than administrative lines, identifying settlement roles and interdependence, mapping key destinations, and stating what the baseline does and does not cover.
- 2.Define the corridor extent and map settlements, stations, employment areas and key services.
- 3.The corridor boundary is justified in writing by function, not convenience.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processing software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 2 · Video lesson: Not recorded — authentic professional recording required.
Measuring accessibility consistently
- Learning objective
- Distance and time thresholds, walk and cycle catchments around stations and centres, service frequency as an accessibility variable, and building a transparent scoring framework whose weights are visible.
- Narration focus
- Establish where people can already reach things, and how.
- Screen action
- Score each settlement against the accessibility framework and record every weight and threshold used.
- Required software
- QGIS, Spreadsheet software, Word processing software
- Example data
- Public census-style population and employment data, synthetic timetable extracts for the rail line and two bus routes, road network data and an Ideeplan-owned accessibility scoring framework.
- Expected learner output
- Another analyst could reproduce every score from the recorded method.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Distance and time thresholds, walk and cycle catchments around stations and centres, service frequency as an accessibility variable, and building a transparent scoring framework whose weights are visible.
- 2.Score each settlement against the accessibility framework and record every weight and threshold used.
- 3.Another analyst could reproduce every score from the recorded method.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processing software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 3 · Video lesson: Not recorded — authentic professional recording required.
Network constraint and current performance
- Learning objective
- Identifying constrained junctions and links, reading synthetic count and delay data, distinguishing a capacity constraint from a safety or severance constraint, and mapping constraint alongside accessibility.
- Narration focus
- Establish where people can already reach things, and how.
- Screen action
- Map the four constrained junctions with their recorded issues and overlay them on the accessibility map.
- Required software
- QGIS, Spreadsheet software, Word processing software
- Example data
- Public census-style population and employment data, synthetic timetable extracts for the rail line and two bus routes, road network data and an Ideeplan-owned accessibility scoring framework.
- Expected learner output
- Each constraint is classified by type and evidenced from the supplied data.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Identifying constrained junctions and links, reading synthetic count and delay data, distinguishing a capacity constraint from a safety or severance constraint, and mapping constraint alongside accessibility.
- 2.Map the four constrained junctions with their recorded issues and overlay them on the accessibility map.
- 3.Each constraint is classified by type and evidenced from the supplied data.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processing software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 4 · Video lesson: Not recorded — authentic professional recording required.
Trip generation in transparent terms
- Learning objective
- Relating homes and floorspace to trips, peak-hour versus daily figures, the assumptions that dominate the result, sensitivity to mode share, and stating trip figures as ranges rather than false precision.
- Narration focus
- Convert allocation choices into transport consequences.
- Screen action
- Build the trip generation sheet for the full growth target with every assumption on the face of the workbook.
- Required software
- QGIS, Spreadsheet software, Word processing software
- Example data
- Synthetic land availability register of eighteen sites, Ideeplan-owned trip rate assumptions and a synthetic growth target of 6,000 homes and two employment areas.
- Expected learner output
- Changing one assumption visibly changes the outputs with no hidden constants.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Relating homes and floorspace to trips, peak-hour versus daily figures, the assumptions that dominate the result, sensitivity to mode share, and stating trip figures as ranges rather than false precision.
- 2.Build the trip generation sheet for the full growth target with every assumption on the face of the workbook.
- 3.Changing one assumption visibly changes the outputs with no hidden constants.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processing software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 5 · Video lesson: Not recorded — authentic professional recording required.
Building allocation options
- Learning objective
- Constructing options that express genuinely different strategies rather than variations of one, concentration versus dispersal versus station-focused growth, respecting site capacity, and keeping the growth total constant across options.
- Narration focus
- Convert allocation choices into transport consequences.
- Screen action
- Build three allocation options from the site register that each deliver the full growth target.
- Required software
- QGIS, Spreadsheet software, Word processing software
- Example data
- Synthetic land availability register of eighteen sites, Ideeplan-owned trip rate assumptions and a synthetic growth target of 6,000 homes and two employment areas.
- Expected learner output
- All three options deliver the same quantum and are strategically distinct.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Constructing options that express genuinely different strategies rather than variations of one, concentration versus dispersal versus station-focused growth, respecting site capacity, and keeping the growth total constant across options.
- 2.Build three allocation options from the site register that each deliver the full growth target.
- 3.All three options deliver the same quantum and are strategically distinct.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processing software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 6 · Video lesson: Not recorded — authentic professional recording required.
Testing options against accessibility and constraint
- Learning objective
- Assigning growth to accessibility bands, estimating mode share by location, loading trips onto constrained junctions in simple terms, and comparing options on a consistent set of indicators.
- Narration focus
- Convert allocation choices into transport consequences.
- Screen action
- Score all three options against accessibility bands and constrained junction loading.
- Required software
- QGIS, Spreadsheet software, Word processing software
- Example data
- Synthetic land availability register of eighteen sites, Ideeplan-owned trip rate assumptions and a synthetic growth target of 6,000 homes and two employment areas.
- Expected learner output
- The comparison table uses identical indicators and units for every option.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Assigning growth to accessibility bands, estimating mode share by location, loading trips onto constrained junctions in simple terms, and comparing options on a consistent set of indicators.
- 2.Score all three options against accessibility bands and constrained junction loading.
- 3.The comparison table uses identical indicators and units for every option.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processing software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 7 · Video lesson: Not recorded — authentic professional recording required.
Infrastructure dependency and phasing
- Learning objective
- Identifying the interventions an option cannot proceed without, distinguishing enabling from mitigating infrastructure, sequencing growth against delivery, and the risk of allocating growth ahead of committed infrastructure.
- Narration focus
- Say what each option requires and which one to pursue.
- Screen action
- Produce the dependency schedule for each option, marking enabling interventions and phase triggers.
- Required software
- QGIS, Spreadsheet software, Word processing software
- Example data
- Synthetic infrastructure cost bands, Ideeplan-owned deliverability criteria and a synthetic policy framework extract.
- Expected learner output
- Each option states the infrastructure required before first occupation and at each phase.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Identifying the interventions an option cannot proceed without, distinguishing enabling from mitigating infrastructure, sequencing growth against delivery, and the risk of allocating growth ahead of committed infrastructure.
- 2.Produce the dependency schedule for each option, marking enabling interventions and phase triggers.
- 3.Each option states the infrastructure required before first occupation and at each phase.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processing software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 8 · Video lesson: Not recorded — authentic professional recording required.
Comparing options and handling uncertainty
- Learning objective
- Multi-criteria comparison without hiding the weighting, testing conclusions against changed mode-share and delivery assumptions, identifying which conclusions are robust, and describing residual uncertainty honestly.
- Narration focus
- Say what each option requires and which one to pursue.
- Screen action
- Run two sensitivity tests and record which conclusions survive both.
- Required software
- QGIS, Spreadsheet software, Word processing software
- Example data
- Synthetic infrastructure cost bands, Ideeplan-owned deliverability criteria and a synthetic policy framework extract.
- Expected learner output
- The recommendation identifies which findings are robust and which are assumption-dependent.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Multi-criteria comparison without hiding the weighting, testing conclusions against changed mode-share and delivery assumptions, identifying which conclusions are robust, and describing residual uncertainty honestly.
- 2.Run two sensitivity tests and record which conclusions survive both.
- 3.The recommendation identifies which findings are robust and which are assumption-dependent.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processing software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 9 · Video lesson: Not recorded — authentic professional recording required.
Writing the recommendation
- Learning objective
- Structuring an advice note for members and officers, separating evidence from judgement, making the recommendation actionable in policy terms, and stating the further work needed before adoption.
- Narration focus
- Say what each option requires and which one to pursue.
- Screen action
- Write the distribution recommendation with evidence, judgement and further work clearly separated.
- Required software
- QGIS, Spreadsheet software, Word processing software
- Example data
- Synthetic infrastructure cost bands, Ideeplan-owned deliverability criteria and a synthetic policy framework extract.
- Expected learner output
- A reader can identify which sentences are evidence and which are professional judgement.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Structuring an advice note for members and officers, separating evidence from judgement, making the recommendation actionable in policy terms, and stating the further work needed before adoption.
- 2.Write the distribution recommendation with evidence, judgement and further work clearly separated.
- 3.A reader can identify which sentences are evidence and which are professional judgement.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processing software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Course production standard
- Recordings are screen-first: the planning drawing, GIS view, AutoCAD or Revit workspace stays the main subject of the frame.
- Any presenter picture-in-picture normally occupies no more than about 8–10% of the frame and never covers maps, legends, drawings, dimensions or annotations.
- On mobile and on dense technical screens the presenter window is reduced further or hidden entirely.
- The Principal Consultant portrait is reserved for approved introductions, explanations and conclusions. It is not used as a generic thumbnail for every course.
- Narration is planned for professional human delivery. No AI narration, AI presenter or recorded lesson exists today.
No lesson has been recorded. Every lesson media status is “Not recorded”.
Any example data used in teaching is synthetic, publicly licensed or owned by Ideeplan Consult, and is clearly labelled as demonstration data. No client file, confidential document or unauthorised project material is used.
Want this course finished first?
Registering interest is not an enrolment. It tells Ideeplan Consult which subjects to complete and review first.