Applied professional course
Transport and Mobility Planning Foundations
The planning-side foundations of movement: network structure, road hierarchy, trip patterns, mode choice and how transport shapes development.
Written teaching content: available for review
Video lessons have not yet been recorded. Written teaching content may be available for review below.
Written teaching content only. This course is not yet available: it has not been professionally reviewed, no lesson is recorded, and enrolment, payment, certificates, downloads and protected access are all disabled.
Review Written Course ContentReading only. This is not enrolment, booking, purchase, account access, a download or protected learning access.
- Written content: Available for review
- Video lessons: Not recorded
- Professional review: Not yet completed
- Enrolment: Not available
- Payment: Disabled
- Certificates: Disabled
- Downloads: Disabled
- Protected access: Disabled
Written course content
Client-style brief
A planning authority is preparing a movement and access framework for a growth corridor. They need planning-side transport work: how land use and movement interact, what hierarchy the corridor needs, how development connects, and what evidence would support their position — not detailed highway engineering.
Professional scenario
Synthetic growth corridor linking a town centre to a proposed urban extension, served by one arterial road, an hourly bus service and a partially complete path network.
Planning problem
Transport is often bolted on after a land-use decision, producing car-dependent development and unenforceable mitigation. The professional problem is to integrate movement with land use from the start, using planning-side tools and evidence.
Learning objectives
- Explain and apply transport–land-use integration at corridor and site scale.
- Define a road hierarchy that supports place as well as movement.
- Assess development access, parking and servicing in planning terms.
- Plan for active travel, public transport and inclusive mobility explicitly.
- Assemble transport evidence and evaluate simple scenarios.
Modules and lessons
0 of 9 lessons open
Module 1
Module 1 — Transport and land-use integration
Establish the relationship between what is built where and how people move.
Trip generation logic, density and mix effects, distance decay for walking and cycling, and why location choice determines travel behaviour more than mitigation does.
Practical exercise: Compare indicative trip outcomes for two land-use distributions on the corridor.
Checkpoint: The comparison identifies which distribution reduces car dependence and why.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Using accessibility evidence to inform allocation and layout, the difference between proximity and access, and how severance changes an apparently well-located site.
Practical exercise: Write an accessibility position for two candidate development locations.
Checkpoint: Each position cites measured access, not proximity.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
What transit-oriented development requires to work, frequency thresholds, interchange quality, and how to plan for multimodal trips rather than single-mode assumptions.
Practical exercise: Set out the conditions the corridor would need to support a TOD approach.
Checkpoint: Conditions are stated as requirements to be confirmed, not as delivered services.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Synthetic corridor land-use, trip-generation and service-frequency data.
Module output: Corridor integration assessment with an accessibility position statement.
Module 2
Module 2 — Hierarchy, access, parking and servicing
Resolve movement at the point where development meets the network.
Movement and place functions together, hierarchy from arterial to local access, junction spacing principles, and designing streets that are not simply pipes.
Practical exercise: Classify the corridor network and draw the intended hierarchy.
Checkpoint: Every classified street has a stated movement and place function.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Access point selection, visibility and geometry as planning considerations, capacity concerns, and the boundary between planning judgement and engineering design.
Practical exercise: Assess two access options for the urban extension and record a planning-side recommendation.
Checkpoint: The recommendation states clearly where engineering assessment is still required.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Parking as demand management, provision levels and their consequences, cycle parking, servicing and delivery needs, and freight routes through a growth corridor.
Practical exercise: Prepare a parking and servicing position with two provision sensitivities.
Checkpoint: The position states that local standards must be confirmed.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Synthetic network hierarchy, access points and servicing teaching data.
Module output: Movement hierarchy and development access strategy.
Module 3
Module 3 — Active travel, inclusion and evidence
Cover the modes and the users that get designed out, and evidence the result.
Continuous networks rather than fragments, crossing provision, junction risk for people walking and cycling, and safety as a layout decision.
Practical exercise: Audit the path network for continuity and propose a prioritised gap list.
Checkpoint: Gaps are prioritised by evidence, not by ease of delivery.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Designing for wheelchair users, people with visual impairment, older people, and people travelling with children; gradients, resting points, surfaces, crossing timing and legibility.
Practical exercise: Run an inclusive-mobility review of one route and record required changes.
Checkpoint: The review addresses at least four distinct user needs.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
What evidence a planning position needs, counting and monitoring basics, building simple do-nothing and do-something scenarios, and reporting uncertainty.
Practical exercise: Build two scenarios for the corridor and write a short evaluation with stated uncertainty.
Checkpoint: The evaluation states its limits and does not present modelled output as fact.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Synthetic path network, crossing audit and count teaching data.
Module output: Movement and access framework with a monitoring and evaluation section.
Project brief
A synthetic growth corridor between a town centre and a proposed urban extension, with one arterial road, an hourly bus service and a fragmented path network.
Your role: Planning-side transport lead preparing a movement and access framework for an authority.
Information available
- Synthetic land-use, network and service-frequency data.
- Synthetic path audit and count teaching data.
- Ideeplan-owned framework and evaluation templates.
Required analysis
- Land-use and movement integration comparison.
- Hierarchy classification and access assessment.
- Parking, servicing and freight position.
- Active travel continuity and inclusive-mobility review.
- Two-scenario evaluation.
Required outputs
- Corridor integration assessment.
- Movement hierarchy plan.
- Development access recommendation.
- Parking and servicing position with sensitivities.
- Active travel gap list and inclusive-mobility review.
- Scenario evaluation and monitoring section.
Presentation standard: Planning-side language throughout, explicit boundaries where engineering assessment is required, and a local-standards confirmation note on every quantitative position.
Marking criteria
- Integration: Land-use and movement decisions are argued together, not sequentially.
- Hierarchy reasoning: Each classification states both movement and place function.
- Mode coverage: Walking, cycling, public transport, servicing and freight are all addressed.
- Inclusion: The review addresses several distinct user needs concretely.
- Scope discipline: The framework stays planning-side and names where engineering input is needed.
Quality-assurance checklist
- No quantitative standard is asserted without a local-confirmation note.
- Active travel gaps are prioritised with a stated basis.
- Scenario outputs are reported with uncertainty.
- Inclusive mobility appears in the framework, not only in an appendix.
- The document does not claim highway design or traffic-engineering competence.
Common mistakes and correction tasks
- Treating transport as mitigation after the land-use decision. Correction: Re-run the comparison so location choice is argued on movement outcomes.
- Counting a low-frequency bus route as public transport access. Correction: Apply a frequency threshold and restate the accessibility position.
- Active travel routes that stop at the site boundary. Correction: Extend the network analysis beyond the boundary and list the connection gaps.
- Presenting planning-side judgement as engineering approval. Correction: Insert an explicit scope statement identifying the required technical input.
Enrolment status
Enrolment is not currently available. This course is still undergoing content, media and professional review.
Register Interest is an expression of interest only. It works without an account, creates no enrolment, no reserved place and no payment order.
Protected lessons, approved videos and approved resource files are not accessible. No protected file URL, signed link or download entitlement is created.
Payments are disabled. No price, checkout, payment provider, payment order or paid-course claim exists in the Academy.
Outstanding before enrolment could open
- Outstanding — Professional content review is complete
- Outstanding — Required videos recorded, reviewed and approved, or the course approved as written-only
- Outstanding — Required practical resources approved and available
- Outstanding — Learner terms approved
- Outstanding — Privacy and data-handling requirements approved
- Outstanding — Course availability explicitly enabled by an authorised administrator
- Outstanding — Payment and refund terms approved (paid courses)
- Outstanding — Payment provider configuration complete (where payment is required)
- Outstanding — Authentication email delivery configured and tested
- Outstanding — Protected content access tested
- Outstanding — Approved delivery and support process in place
Progress, assessment and certificates
Submission access is not currently available
Lesson and course progress tracking is not active. No progress record, completion percentage or completed lesson exists for any account, and no course can record progress until enrolment opens.
Practical assessments cannot be submitted. Submission access is not currently available: there is no active enrolment, no upload configuration and no authorised reviewer workflow in operation.
No assessment has been marked, reviewed, corrected or passed. Reviewer feedback, correction tasks and pass decisions are made by an authorised human reviewer and none exists.
No certificate is issued, approved or pending. A future Academy certificate would be a course-completion certificate only — not a professional licence, statutory qualification, accreditation or government-recognised award.
Certificate verification is disabled until a certificate is genuinely issued. No verification result is produced for any reference.
Assessment formats planned for the Academy
Written briefs, required deliverables and marking criteria are published inside the course content above for open review. None of them can be submitted or marked at present.
- Practical planning task
- GIS mapping exercise
- Site-appraisal task
- Feasibility assessment
- CAD or drawing task
- Revit coordination task
- Planning-report task
- Policy-assessment task
- Transport or access analysis
- Environmental or green-infrastructure exercise
- Final course project
Outstanding before completion or a certificate could exist
- Outstanding — Learner identity verified by an authorised member of staff
- Outstanding — Learner holds a valid active or completed enrolment
- Outstanding — All required lessons completed
- Outstanding — All required practical assessments passed
- Outstanding — A recorded assessment decision exists for every required task
- Outstanding — All requested corrections completed
- Outstanding — Course content professionally reviewed and signed off
- Outstanding — Authorised reviewer has approved completion
- Outstanding — Course certificate policy approved
- Outstanding — Certificate wording approved by Ideeplan Consult
- Outstanding — Course is officially available
- Outstanding — Unique certificate numbering and a secure verification route configured
Practical resources
Resources for this course
13 resource records · 13 with a written preview · 0 with a file under preparation · Download access not yet enabled.
All demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult and is labelled as demonstration material. No confidential client file, personal information, private agency document or unreleased project drawing is used.
- Written preview available — downloadable file not yet available
Practical project brief
Sets the professional situation, the role the learner takes and what must be produced.
- Resource type
- Brief
- Format
- Written brief shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — One brief governs the whole course: every lesson exercise contributes to the same final deliverable.
- Access
- No account required — written preview is public
- A synthetic growth corridor between a town centre and a proposed urban extension, with one arterial road, an hourly bus service and a fragmented path network.
- Your role: Planning-side transport lead preparing a movement and access framework for an authority.
- Available information: Synthetic land-use, network and service-frequency data.
- Available information: Synthetic path audit and count teaching data.
- Available information: Ideeplan-owned framework and evaluation templates.
- Required analysis: Land-use and movement integration comparison.
- Required analysis: Hierarchy classification and access assessment.
- Required analysis: Parking, servicing and freight position.
- Required analysis: Active travel continuity and inclusive-mobility review.
- Required analysis: Two-scenario evaluation.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Client-style instruction and problem statement
Gives the learner the instruction as a practitioner would receive it, and names the problem to be solved.
- Resource type
- Brief
- Format
- Written statement shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — Scenario framing applies to every lesson in the course.
- Access
- No account required — written preview is public
Synthetic growth corridor linking a town centre to a proposed urban extension, served by one arterial road, an hourly bus service and a partially complete path network.
Transport is often bolted on after a land-use decision, producing car-dependent development and unenforceable mitigation. The professional problem is to integrate movement with land use from the start, using planning-side tools and evidence.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 1 learner worksheet — Module 1 — Transport and land-use integration
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor integration assessment with an accessibility position statement.
- Lessons supported
- 3 — Supports the 3 lessons in module 1, which build one shared output.
- Access
- No account required — written preview is public
- How land use generates movement — Compare indicative trip outcomes for two land-use distributions on the corridor.
- Accessibility as a planning test — Write an accessibility position for two candidate development locations.
- Public transport, TOD principles and multimodal movement — Set out the conditions the corridor would need to support a TOD approach.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 2 learner worksheet — Module 2 — Hierarchy, access, parking and servicing
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Movement hierarchy and development access strategy.
- Lessons supported
- 3 — Supports the 3 lessons in module 2, which build one shared output.
- Access
- No account required — written preview is public
- Road hierarchy and street function — Classify the corridor network and draw the intended hierarchy.
- Development access in planning terms — Assess two access options for the urban extension and record a planning-side recommendation.
- Parking, servicing and freight — Prepare a parking and servicing position with two provision sensitivities.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 3 learner worksheet — Module 3 — Active travel, inclusion and evidence
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Movement and access framework with a monitoring and evaluation section.
- Lessons supported
- 3 — Supports the 3 lessons in module 3, which build one shared output.
- Access
- No account required — written preview is public
- Active travel and road safety in planning — Audit the path network for continuity and propose a prioritised gap list.
- Inclusive mobility — Run an inclusive-mobility review of one route and record required changes.
- Transport evidence and scenario evaluation — Build two scenarios for the corridor and write a short evaluation with stated uncertainty.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Task checklist
Confirms every required piece of work has been produced before submission.
- Resource type
- Checklist
- Format
- Written checklist shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — A single task checklist tracks progress across all modules.
- Access
- No account required — written preview is public
- Corridor integration assessment.
- Movement hierarchy plan.
- Development access recommendation.
- Parking and servicing position with sensitivities.
- Active travel gap list and inclusive-mobility review.
- Scenario evaluation and monitoring section.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Example data and drawing base
Synthetic corridor land-use, trip-generation and service-frequency data. GIS exercises are planned around plain, checkable formats: CSV and clearly labelled local-grid JSON on the named grid IDP-LOCAL-GRID. GeoJSON is not used for local-grid training data because the format asserts WGS 84 degrees. No QGIS project file, GeoPackage or raster file is claimed.
- Resource type
- GIS exercise pack
- Format
- CSV and local-grid JSON (planned) — no GeoJSON, QGIS project, GeoPackage or raster file is claimed
- Status
- Planned
- Data classification
- Synthetic demonstration data
- Licence or ownership
- Synthetic demonstration material prepared by Ideeplan Consult. No client file, personal information, private agency document or unreleased project drawing is used.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — One demonstration data base is used by every lesson so results stay comparable.
- Access
- No account required — written preview is public
Demonstration data item What it contains and how it is used Data ownership and licence Synthetic training data prepared and owned by Ideeplan Consult. It is fictional: it is not a real client project, a real site or a real location, and it must not be presented as one. Free to study on this page; redistribution is not permitted. Module 1 input — Module 1 — Transport and land-use integration Synthetic corridor land-use, trip-generation and service-frequency data. Module 2 input — Module 2 — Hierarchy, access, parking and servicing Synthetic network hierarchy, access points and servicing teaching data. Module 3 input — Module 3 — Active travel, inclusion and evidence Synthetic path network, crossing audit and count teaching data. Lawful sourcing where real data is substituted Where a learner substitutes real data, use only openly licensed or lawfully obtained sources, record the publisher, dataset title, version and access date, and cite them in the final deliverable. Do not use restricted, confidential or personal data. Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Analysis and calculation template
Structures the analysis so assumptions are visible and checkable. Any figures used in a template are teaching assumptions, not market evidence. Local costs, policies, standards and valuation assumptions must be independently confirmed before any of this is applied to a real project.
- Resource type
- Suitability matrix
- Format
- CSV matrix (planned)
- Status
- Planned
- Data classification
- Synthetic demonstration data
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — The same analysis structure is completed progressively through the course.
- Access
- No account required — written preview is public
- Record every assumption on its own labelled row, with the source or reason beside it.
- Module 1 working section — Corridor integration assessment with an accessibility position statement.
- Module 2 working section — Movement hierarchy and development access strategy.
- Module 3 working section — Movement and access framework with a monitoring and evaluation section.
- Required output carried into the analysis — Corridor integration assessment.
- Required output carried into the analysis — Movement hierarchy plan.
- Required output carried into the analysis — Development access recommendation.
- Required output carried into the analysis — Parking and servicing position with sensitivities.
- Required output carried into the analysis — Active travel gap list and inclusive-mobility review.
- Required output carried into the analysis — Scenario evaluation and monitoring section.
- Check row: totals, units and areas reconcile before the result is carried into the deliverable.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Final deliverable template
Sets the expected structure and presentation standard for Corridor movement and access framework.
- Resource type
- Planning-report template
- Format
- Structured document outline (planned)
- Status
- Planned
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — The final deliverable draws on every module output.
- Access
- No account required — written preview is public
- Final named deliverable — Corridor movement and access framework
- Section 1 — Corridor integration assessment with an accessibility position statement.
- Section 2 — Movement hierarchy and development access strategy.
- Section 3 — Movement and access framework with a monitoring and evaluation section.
- Must be present — Corridor integration assessment.
- Must be present — Movement hierarchy plan.
- Must be present — Development access recommendation.
- Must be present — Parking and servicing position with sensitivities.
- Must be present — Active travel gap list and inclusive-mobility review.
- Must be present — Scenario evaluation and monitoring section.
- Presentation and submission standard — Planning-side language throughout, explicit boundaries where engineering assessment is required, and a local-standards confirmation note on every quantitative position.
- Sources and citations: list every dataset, publisher, version and access date used, and state clearly where synthetic Ideeplan training data was used.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Quality-control checklist
Professional checks to run before the work is treated as finished.
- Resource type
- Checklist
- Format
- Written checklist shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — Quality control is applied to the whole submission, not to a single lesson.
- Access
- No account required — written preview is public
- No quantitative standard is asserted without a local-confirmation note.
- Active travel gaps are prioritised with a stated basis.
- Scenario outputs are reported with uncertainty.
- Inclusive mobility appears in the framework, not only in an appendix.
- The document does not claim highway design or traffic-engineering competence.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Marking and review rubric
States what a satisfactory professional standard looks like for each criterion.
- Resource type
- Marking rubric
- Format
- Written rubric shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — One rubric reviews the final deliverable produced across all modules.
- Access
- No account required — written preview is public
Criterion Satisfactory standard Integration Land-use and movement decisions are argued together, not sequentially. Hierarchy reasoning Each classification states both movement and place function. Mode coverage Walking, cycling, public transport, servicing and freight are all addressed. Inclusion The review addresses several distinct user needs concretely. Scope discipline The framework stays planning-side and names where engineering input is needed. Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Correction-task sheet
Common professional mistakes and the correction the learner practises.
- Resource type
- Correction-task sheet
- Format
- Written task sheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — Correction tasks address mistakes that can appear anywhere in the course.
- Access
- No account required — written preview is public
- Treating transport as mitigation after the land-use decision. — Re-run the comparison so location choice is argued on movement outcomes.
- Counting a low-frequency bus route as public transport access. — Apply a frequency threshold and restate the accessibility position.
- Active travel routes that stop at the site boundary. — Extend the network analysis beyond the boundary and list the connection gaps.
- Presenting planning-side judgement as engineering approval. — Insert an explicit scope statement identifying the required technical input.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Submission guidance
How the finished work should be assembled and presented for professional review.
- Resource type
- Checklist
- Format
- Written guidance shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Corridor movement and access framework
- Lessons supported
- 9 — Submission guidance covers the single final deliverable.
- Access
- No account required — written preview is public
Planning-side language throughout, explicit boundaries where engineering assessment is required, and a local-standards confirmation note on every quantitative position.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
Media status
Video lessons for this course
- Video lessons
- Video lesson: Not recorded — authentic professional recording required.
- Narration
- Professional narration — planned, not produced
- Captions
- Not yet produced
- Transcript
- Not yet produced
- Software demonstration
- Genuine screen capture from the real application only — no mockup, simulated interface or AI-generated screen.
- Software version and operating system
- No software version is published until it has been read from the actual recorded session. Until then the version reads “To be stated from the recorded session”.
- Production plan
- Prepared for professional review
- Enrolment, payment and downloads
- Disabled
Video lesson: Not recorded — authentic professional recording required. The written lesson on this page is complete and can be read in full without a video, an account, enrolment or payment.
Authentic software screen capture only — non-negotiable standard
Applies to every software demonstrated in the Academy, including AutoCAD, QGIS, Revit, ArcGIS, SketchUp, Lumion, Civil 3D, Rhino and any other software used. The final video must accurately represent what a learner sees when using the stated software version.
- Every demonstration is a genuine screen recording or screenshot captured from the actual installed software being taught.
- The exact software name, version, operating system and relevant workspace are stated on screen and in the lesson notes, as read from the recorded session.
- The real interface is shown: menus, panels, toolbars, properties, layer controls, settings and the command line or log.
- The real cursor, tool selection, commands, settings and the resulting output are visible.
- Capture is 16:9 and readable at 720p, with clear, unhurried cursor movement; the screen stays clear enough for learners to follow.
- The view zooms in whenever text, settings, coordinates or field values would otherwise be hard to read.
- The exact command, menu path or tool name is shown as it appears in the software.
- Useful keyboard shortcuts are shown alongside the menu path, never instead of it.
- Differences between software versions or operating systems are stated wherever the interface may display differently.
- Steps are numbered on screen, with callouts pointing at the actual control being used.
- Any annotation is added only after recording and must never alter or misrepresent the software interface.
- Captions and a complete transcript are produced before professional review.
- Any presenter window stays small, is positioned clear of technical content, and is hidden on mobile widths and on dense technical screens.
Interface visibility on every recording
- The full application interface is shown at the beginning of every demonstration, with the application identity and exact version clearly visible.
- The relevant menu bar, ribbon, toolbar or toolbox stays visible while each step is explained; the interface context is never cropped away.
- Layers, properties, project browser or data panels are shown wherever applicable.
- The command line, status bar or coordinate/CRS information is shown wherever relevant.
- Real cursor movement and visible clicks are captured, with visible cursor highlighting or click indicators.
- The selected tool and its effect are visible, and complete dialog boxes and settings are shown whenever one is opened.
- The resulting drawing, map, model or output is shown in the recording.
- Zoom is used only when necessary for small text or settings, always retaining enough context to identify the application and tool in use.
- The standard applies to every software course and is verified before any video is marked recorded or approved; if the required authentic interface is not visible, the lesson remains “Video lesson: Not recorded — authentic professional recording required.”
Never used
- Generic website mockups standing in for a software workspace.
- Simulated, redrawn, reconstructed or redesigned replica interfaces for any software.
- AI-generated software screens, panels, dialogs or map canvases.
- Generic illustrations replacing the real interface.
- Unverified screenshots taken from any source other than the recorded session.
- Fake video players, placeholder thumbnails or invented durations.
- Invented menus, tool names, command names, dialog options or keyboard shortcuts.
- Hiding important controls or covering them with a presenter window.
- Annotations that alter or misrepresent the recorded software interface.
- Claiming or implying that a simulated screen is an authentic software demonstration.
QGIS — what the recording must show
Exact QGIS version to be stated from the recorded session. Operating system to be stated from the recorded session; menu positions and file dialogs differ between systems.
- 1.Project CRS: Project Properties, the CRS tab and the selected coordinate reference system.
- 2.Layer loading: the Data Source Manager or Browser panel and the layer added to the canvas.
- 3.Layer properties: the Layer Properties dialog and each tab used in the lesson.
- 4.Symbology: the Symbology tab with the real renderer, classes and colour settings.
- 5.Attribute tables: the attribute table, field values, selection and expression use.
- 6.Processing tools: the Processing Toolbox with the tool searched and opened by its real name.
- 7.Analysis settings: every parameter in the tool dialog, including output location.
- 8.Map layout: the Print Layout window, page setup and map item.
- 9.Legend, scale and north arrow: each item added from the real layout toolbar.
- 10.Export and quality checks: the export dialog settings and a check of the exported file.
No authentic software recording or screenshot exists yet. Every software lesson remains “Video lesson: Not recorded — authentic professional recording required.”
Real professional classroom experience — every lesson
Applies to every future Academy lesson, software-based or not. The finished lesson presents as authentic professional training, professionally narrated and screen-led: video + written guide + supporting data + practical task + quality checklist + final named deliverable.
Lesson structure
- 1.Professional introduction.
- 2.Realistic project situation.
- 3.Learner role within that situation.
- 4.Problem statement.
- 5.Learning objectives.
- 6.Required software and data.
- 7.Step-by-step demonstration.
- 8.Explanation of the professional reasoning behind each action.
- 9.Practical learner task.
- 10.Checkpoint or pause activity.
- 11.Common mistake and its correction.
- 12.Quality-control review.
- 13.Final recap.
- 14.Named learner deliverable.
Video requirements
- Professional narration that is clear, natural and paced for instruction, synchronised with the screen action.
- Authentic screen recording from the actual software, with visible menus, tools, panels, commands, settings and outputs.
- Natural cursor movement and deliberate pacing, with a clear explanation of why each action is taken.
- Realistic corrections and troubleshooting shown, not edited away.
- Clear 16:9 screen capture.
- Captions and a complete transcript.
- Chapter titles and lesson sections.
- A small presenter window only where useful; it never covers technical content and is hidden on mobile or dense technical screens.
Never produced as a lesson
- Automated slideshows.
- Generic screen tours.
- Silent software demonstrations.
- Marketing videos presented as lessons.
- AI-avatar presentations.
- Simulated software tutorials.
- Fast montages without explanation.
- An invented tutor, instructor identity, voice, recording, thumbnail or completion status.
Lessons use only synthetic, publicly licensed or Ideeplan-owned examples. No confidential client information is used.
No genuine professional recording exists yet. Until one does, every lesson remains “Video lesson: Not recorded — authentic professional recording required.” Enrolment, payments, certificates and protected learner access stay disabled during this production stage.
Professional narration and screen-first production
- Every Academy lesson is planned as a professionally narrated, screen-led practical lesson with captions and a complete transcript.
- No AI avatar, virtual presenter or artificial talking head is used, and no named person is imitated. No lesson is described as human-narrated, instructor-led by a named person or personally presented unless that is factually true.
- No instructor identity is published until a real, named professional has recorded and approved the lesson.
- Recordings are screen-first: the GIS view, planning drawing, AutoCAD or Revit workspace or document remains the main subject of the frame.
- Any presenter picture-in-picture normally occupies about 8–10% of the frame, never covers technical content, and is reduced or hidden on small screens.
- The Principal Consultant portrait is reserved for approved introductions and conclusions. It is never used as a repeated course thumbnail, and the Academy remains company-first.
No lesson has been recorded and no narration has been produced. Scripts exist as production plans only, and every lesson video status remains “Not recorded”.
Demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult. No confidential client file, unauthorised agency dataset or private project information is used.
Methods are jurisdiction-neutral. Learners must confirm local laws, policies and technical standards before applying them to a real project.
A production plan describes how a lesson would be recorded. It is not a recording, and it does not create an enrolment, account, payment or reserved place.
9 lesson production plans · suggested recording time about 90 minutes in total (a planning estimate, not a recorded duration) · every lesson video status: Not recorded.
Lesson 1 · Video lesson: Not recorded — authentic professional recording required.
How land use generates movement
- Learning objective
- Trip generation logic, density and mix effects, distance decay for walking and cycling, and why location choice determines travel behaviour more than mitigation does.
- Narration focus
- Establish the relationship between what is built where and how people move.
- Screen action
- Compare indicative trip outcomes for two land-use distributions on the corridor.
- Required software
- QGIS, Spreadsheet software, Word processor
- Example data
- Synthetic corridor land-use, trip-generation and service-frequency data.
- Expected learner output
- The comparison identifies which distribution reduces car dependence and why.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Trip generation logic, density and mix effects, distance decay for walking and cycling, and why location choice determines travel behaviour more than mitigation does.
- 2.Compare indicative trip outcomes for two land-use distributions on the corridor.
- 3.The comparison identifies which distribution reduces car dependence and why.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 2 · Video lesson: Not recorded — authentic professional recording required.
Accessibility as a planning test
- Learning objective
- Using accessibility evidence to inform allocation and layout, the difference between proximity and access, and how severance changes an apparently well-located site.
- Narration focus
- Establish the relationship between what is built where and how people move.
- Screen action
- Write an accessibility position for two candidate development locations.
- Required software
- QGIS, Spreadsheet software, Word processor
- Example data
- Synthetic corridor land-use, trip-generation and service-frequency data.
- Expected learner output
- Each position cites measured access, not proximity.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Using accessibility evidence to inform allocation and layout, the difference between proximity and access, and how severance changes an apparently well-located site.
- 2.Write an accessibility position for two candidate development locations.
- 3.Each position cites measured access, not proximity.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 3 · Video lesson: Not recorded — authentic professional recording required.
Public transport, TOD principles and multimodal movement
- Learning objective
- What transit-oriented development requires to work, frequency thresholds, interchange quality, and how to plan for multimodal trips rather than single-mode assumptions.
- Narration focus
- Establish the relationship between what is built where and how people move.
- Screen action
- Set out the conditions the corridor would need to support a TOD approach.
- Required software
- QGIS, Spreadsheet software, Word processor
- Example data
- Synthetic corridor land-use, trip-generation and service-frequency data.
- Expected learner output
- Conditions are stated as requirements to be confirmed, not as delivered services.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.What transit-oriented development requires to work, frequency thresholds, interchange quality, and how to plan for multimodal trips rather than single-mode assumptions.
- 2.Set out the conditions the corridor would need to support a TOD approach.
- 3.Conditions are stated as requirements to be confirmed, not as delivered services.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 4 · Video lesson: Not recorded — authentic professional recording required.
Road hierarchy and street function
- Learning objective
- Movement and place functions together, hierarchy from arterial to local access, junction spacing principles, and designing streets that are not simply pipes.
- Narration focus
- Resolve movement at the point where development meets the network.
- Screen action
- Classify the corridor network and draw the intended hierarchy.
- Required software
- QGIS, Spreadsheet software, Word processor
- Example data
- Synthetic network hierarchy, access points and servicing teaching data.
- Expected learner output
- Every classified street has a stated movement and place function.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Movement and place functions together, hierarchy from arterial to local access, junction spacing principles, and designing streets that are not simply pipes.
- 2.Classify the corridor network and draw the intended hierarchy.
- 3.Every classified street has a stated movement and place function.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 5 · Video lesson: Not recorded — authentic professional recording required.
Development access in planning terms
- Learning objective
- Access point selection, visibility and geometry as planning considerations, capacity concerns, and the boundary between planning judgement and engineering design.
- Narration focus
- Resolve movement at the point where development meets the network.
- Screen action
- Assess two access options for the urban extension and record a planning-side recommendation.
- Required software
- QGIS, Spreadsheet software, Word processor
- Example data
- Synthetic network hierarchy, access points and servicing teaching data.
- Expected learner output
- The recommendation states clearly where engineering assessment is still required.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Access point selection, visibility and geometry as planning considerations, capacity concerns, and the boundary between planning judgement and engineering design.
- 2.Assess two access options for the urban extension and record a planning-side recommendation.
- 3.The recommendation states clearly where engineering assessment is still required.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 6 · Video lesson: Not recorded — authentic professional recording required.
Parking, servicing and freight
- Learning objective
- Parking as demand management, provision levels and their consequences, cycle parking, servicing and delivery needs, and freight routes through a growth corridor.
- Narration focus
- Resolve movement at the point where development meets the network.
- Screen action
- Prepare a parking and servicing position with two provision sensitivities.
- Required software
- QGIS, Spreadsheet software, Word processor
- Example data
- Synthetic network hierarchy, access points and servicing teaching data.
- Expected learner output
- The position states that local standards must be confirmed.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Parking as demand management, provision levels and their consequences, cycle parking, servicing and delivery needs, and freight routes through a growth corridor.
- 2.Prepare a parking and servicing position with two provision sensitivities.
- 3.The position states that local standards must be confirmed.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 7 · Video lesson: Not recorded — authentic professional recording required.
Active travel and road safety in planning
- Learning objective
- Continuous networks rather than fragments, crossing provision, junction risk for people walking and cycling, and safety as a layout decision.
- Narration focus
- Cover the modes and the users that get designed out, and evidence the result.
- Screen action
- Audit the path network for continuity and propose a prioritised gap list.
- Required software
- QGIS, Spreadsheet software, Word processor
- Example data
- Synthetic path network, crossing audit and count teaching data.
- Expected learner output
- Gaps are prioritised by evidence, not by ease of delivery.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Continuous networks rather than fragments, crossing provision, junction risk for people walking and cycling, and safety as a layout decision.
- 2.Audit the path network for continuity and propose a prioritised gap list.
- 3.Gaps are prioritised by evidence, not by ease of delivery.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 8 · Video lesson: Not recorded — authentic professional recording required.
Inclusive mobility
- Learning objective
- Designing for wheelchair users, people with visual impairment, older people, and people travelling with children; gradients, resting points, surfaces, crossing timing and legibility.
- Narration focus
- Cover the modes and the users that get designed out, and evidence the result.
- Screen action
- Run an inclusive-mobility review of one route and record required changes.
- Required software
- QGIS, Spreadsheet software, Word processor
- Example data
- Synthetic path network, crossing audit and count teaching data.
- Expected learner output
- The review addresses at least four distinct user needs.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Designing for wheelchair users, people with visual impairment, older people, and people travelling with children; gradients, resting points, surfaces, crossing timing and legibility.
- 2.Run an inclusive-mobility review of one route and record required changes.
- 3.The review addresses at least four distinct user needs.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 9 · Video lesson: Not recorded — authentic professional recording required.
Transport evidence and scenario evaluation
- Learning objective
- What evidence a planning position needs, counting and monitoring basics, building simple do-nothing and do-something scenarios, and reporting uncertainty.
- Narration focus
- Cover the modes and the users that get designed out, and evidence the result.
- Screen action
- Build two scenarios for the corridor and write a short evaluation with stated uncertainty.
- Required software
- QGIS, Spreadsheet software, Word processor
- Example data
- Synthetic path network, crossing audit and count teaching data.
- Expected learner output
- The evaluation states its limits and does not present modelled output as fact.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.What evidence a planning position needs, counting and monitoring basics, building simple do-nothing and do-something scenarios, and reporting uncertainty.
- 2.Build two scenarios for the corridor and write a short evaluation with stated uncertainty.
- 3.The evaluation states its limits and does not present modelled output as fact.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Course production standard
- Recordings are screen-first: the planning drawing, GIS view, AutoCAD or Revit workspace stays the main subject of the frame.
- Any presenter picture-in-picture normally occupies no more than about 8–10% of the frame and never covers maps, legends, drawings, dimensions or annotations.
- On mobile and on dense technical screens the presenter window is reduced further or hidden entirely.
- The Principal Consultant portrait is reserved for approved introductions, explanations and conclusions. It is not used as a generic thumbnail for every course.
- Narration is planned for professional human delivery. No AI narration, AI presenter or recorded lesson exists today.
No lesson has been recorded. Every lesson media status is “Not recorded”.
Any example data used in teaching is synthetic, publicly licensed or owned by Ideeplan Consult, and is clearly labelled as demonstration data. No client file, confidential document or unauthorised project material is used.
Want this course finished first?
Registering interest is not an enrolment. It tells Ideeplan Consult which subjects to complete and review first.