Applied professional course
SuDS, Drainage and Stormwater Concept Strategy
Develop a concept-stage surface-water strategy that shapes the layout instead of being retrofitted into leftover corners.
Written teaching content: available for review
Video lessons have not yet been recorded. Written teaching content may be available for review below.
Written teaching content only. This course is not yet available: it has not been professionally reviewed, no lesson is recorded, and enrolment, payment, certificates, downloads and protected access are all disabled.
Review Written Course ContentReading only. This is not enrolment, booking, purchase, account access, a download or protected learning access.
- Written content: Available for review
- Video lessons: Not recorded
- Professional review: Not yet completed
- Enrolment: Not available
- Payment: Disabled
- Certificates: Disabled
- Downloads: Disabled
- Protected access: Disabled
Written course content
Client-style brief
A residential scheme on a gently sloping site must show, at concept stage, how surface water will be managed without increasing risk downstream. The team needs a drainage concept strategy that fits the layout, uses surface features where possible, states its assumptions and identifies what the drainage engineer must confirm.
Professional scenario
Synthetic 12-hectare site pack: topographic surface, soil and infiltration indicator layers, an existing watercourse and outfall, a synthetic groundwater note, and a draft residential layout with roads, plots and open space.
Planning problem
Drainage is often treated as an engineering afterthought, producing tanks under car parks and a layout that had no room for water. The professional problem is to integrate a surface-water strategy into the concept layout early, at the right level of detail, without overstating certainty.
Learning objectives
- Read a site's drainage catchments, flow paths and outfall options.
- Apply the drainage hierarchy and select appropriate concept components.
- Size and locate features indicatively with stated assumptions.
- Integrate drainage into layout, open space and green infrastructure.
- Produce a concept strategy that names what specialist design must confirm.
Modules and lessons
0 of 9 lessons open
Module 1
Module 1 — Reading water on the site
Understand how water arrives, moves and leaves before proposing anything.
Deriving sub-catchments and overland flow paths from terrain, distinguishing on-site from upstream contributing area, identifying ponding low points, and recognising flow routes that a layout must not block.
Practical exercise: Delineate sub-catchments and flow paths for the teaching site and mark every ponding low point.
Checkpoint: Upstream contributing area is identified separately from on-site runoff.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Reading soil and geology indicators as a first view on infiltration, the significance of groundwater levels and contamination for infiltration, and why an indicator layer never replaces on-site testing.
Practical exercise: Assess infiltration potential across the site by zone and state the testing required to confirm each.
Checkpoint: Every infiltration judgement is labelled indicative and paired with a testing requirement.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
The order of preference from infiltration to watercourse to sewer, identifying viable outfall points and their levels, the meaning of restricted discharge rates, and the downstream consequences of getting it wrong.
Practical exercise: Evaluate three discharge options for the site and rank them with reasons and consent requirements.
Checkpoint: The ranking follows the hierarchy and each option names the consent or agreement needed.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Synthetic topographic surface, soil and infiltration indicator layers, a teaching watercourse and outfall, and a groundwater-level note.
Module output: Catchment and flow-path plan with an outfall and infiltration options assessment.
Module 2
Module 2 — Concept components and indicative sizing
Choose and size components that suit the site, the layout and long-term maintenance.
Source control, site control and regional control in sequence; permeable surfaces, swales, filter strips, rain gardens, basins, ponds and wetlands; and matching components to gradient, ground conditions and available space.
Practical exercise: Build a management train for two sub-catchments and justify each component against site conditions.
Checkpoint: Each train begins with source control rather than a single end-of-pipe feature.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Concept-stage volume estimation, impermeable area assumptions, the role of greenfield runoff rates and climate allowances, and expressing sizing as a spatial requirement rather than a final engineering figure.
Practical exercise: Produce indicative storage requirements per sub-catchment with every assumption listed.
Checkpoint: Every figure is accompanied by its assumption and labelled indicative.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Designing safe exceedance routes for events beyond the design standard, keeping flow paths out of buildings, and planning access, adoption and maintenance responsibility from the outset.
Practical exercise: Map exceedance routes across the layout and draft a maintenance and adoption note for each component type.
Checkpoint: No exceedance route passes through a proposed dwelling or blocked corridor.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Ideeplan-owned component-selection matrix, a teaching indicative-sizing worksheet and the draft residential layout.
Module output: Component selection schedule with indicative sizing and locations.
Module 3
Module 3 — Integration, drawing and reporting
Make drainage part of the place, then document the strategy honestly.
Making basins and swales usable amenity and habitat space, avoiding fenced-off residual land, coordinating with levels, roads, plots and services, and revising the layout where drainage demands it.
Practical exercise: Revise the draft layout to accommodate the drainage concept and record each layout change made.
Checkpoint: Drainage features contribute amenity or habitat value, not only storage.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
What a concept drainage drawing must show: catchments, components, flow direction, exceedance routes, outfall, indicative levels and areas; conventions and annotation; and the difference from a detailed drainage design drawing.
Practical exercise: Produce the concept drainage strategy drawing with full annotation and a component key.
Checkpoint: The drawing is clearly labelled concept stage and shows flow direction throughout.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Structuring the note, stating assumptions and standards used, listing every item requiring specialist confirmation, and writing a handover that a drainage engineer can pick up without reverse-engineering the concept.
Practical exercise: Write the strategy note including an assumptions register and a specialist confirmation schedule.
Checkpoint: The note states plainly that it is not a detailed drainage design.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Draft layout, green-infrastructure and open-space layers, and an Ideeplan-owned concept drainage-strategy template.
Module output: Concept surface-water strategy drawing and supporting strategy note.
Project brief
A synthetic 12-hectare gently sloping residential site with a watercourse to one boundary and mixed ground conditions.
Your role: Planning and masterplanning lead preparing the concept surface-water strategy with the design team.
Information available
- Synthetic topographic surface and levels data.
- Soil, infiltration indicator and groundwater teaching notes.
- Existing watercourse, outfall and downstream context.
- Draft residential layout and Ideeplan-owned strategy templates.
Required analysis
- Sub-catchment and flow-path delineation.
- Infiltration potential zoning with testing requirements.
- Discharge option appraisal against the hierarchy.
- Management-train selection and indicative sizing.
- Exceedance routing and maintenance planning.
Required outputs
- Catchment and flow-path plan.
- Component selection and indicative sizing schedule.
- Revised layout accommodating drainage.
- Annotated concept drainage strategy drawing.
- Strategy note with assumptions register and specialist confirmation schedule.
Presentation standard: Concept-stage labelling throughout, flow direction shown on every drawing, assumptions listed with figures, and no implication of detailed engineering design.
Marking criteria
- Site reading: Catchments, flow paths and upstream contribution are correctly identified.
- Hierarchy discipline: Discharge options follow the hierarchy with reasons for each rejection.
- Assumption transparency: Every indicative figure names the assumption behind it.
- Design integration: The layout was revised so drainage features add amenity or habitat value.
- Scope honesty: The strategy names what specialist design must confirm and claims nothing more.
Quality-assurance checklist
- Upstream contributing area is shown separately from on-site runoff.
- Every infiltration judgement is marked indicative with a testing requirement.
- Each management train starts with source control.
- Exceedance routes avoid buildings and are drawn on the strategy plan.
- Local drainage standards, discharge rates, climate allowances, adoption policies and consenting requirements are confirmed with the relevant authority and a qualified drainage engineer before design.
Common mistakes and correction tasks
- Proposing infiltration across the whole site from a soil map alone. Correction: Zone infiltration potential as indicative, set a testing requirement and provide an alternative discharge route.
- Placing a single detention basin at the low point with no source control. Correction: Rebuild as a management train with source and site control and resize the basin accordingly.
- Routing exceedance flow between two rows of dwellings. Correction: Re-route through open space or a designed corridor and amend the layout to keep it clear.
- Presenting indicative storage volumes as final design figures. Correction: Label them indicative, attach the assumptions register and add the specialist confirmation item.
Enrolment status
Enrolment is not currently available. This course is still undergoing content, media and professional review.
Register Interest is an expression of interest only. It works without an account, creates no enrolment, no reserved place and no payment order.
Protected lessons, approved videos and approved resource files are not accessible. No protected file URL, signed link or download entitlement is created.
Payments are disabled. No price, checkout, payment provider, payment order or paid-course claim exists in the Academy.
Outstanding before enrolment could open
- Outstanding — Professional content review is complete
- Outstanding — Required videos recorded, reviewed and approved, or the course approved as written-only
- Outstanding — Required practical resources approved and available
- Outstanding — Learner terms approved
- Outstanding — Privacy and data-handling requirements approved
- Outstanding — Course availability explicitly enabled by an authorised administrator
- Outstanding — Payment and refund terms approved (paid courses)
- Outstanding — Payment provider configuration complete (where payment is required)
- Outstanding — Authentication email delivery configured and tested
- Outstanding — Protected content access tested
- Outstanding — Approved delivery and support process in place
Progress, assessment and certificates
Submission access is not currently available
Lesson and course progress tracking is not active. No progress record, completion percentage or completed lesson exists for any account, and no course can record progress until enrolment opens.
Practical assessments cannot be submitted. Submission access is not currently available: there is no active enrolment, no upload configuration and no authorised reviewer workflow in operation.
No assessment has been marked, reviewed, corrected or passed. Reviewer feedback, correction tasks and pass decisions are made by an authorised human reviewer and none exists.
No certificate is issued, approved or pending. A future Academy certificate would be a course-completion certificate only — not a professional licence, statutory qualification, accreditation or government-recognised award.
Certificate verification is disabled until a certificate is genuinely issued. No verification result is produced for any reference.
Assessment formats planned for the Academy
Written briefs, required deliverables and marking criteria are published inside the course content above for open review. None of them can be submitted or marked at present.
- Practical planning task
- GIS mapping exercise
- Site-appraisal task
- Feasibility assessment
- CAD or drawing task
- Revit coordination task
- Planning-report task
- Policy-assessment task
- Transport or access analysis
- Environmental or green-infrastructure exercise
- Final course project
Outstanding before completion or a certificate could exist
- Outstanding — Learner identity verified by an authorised member of staff
- Outstanding — Learner holds a valid active or completed enrolment
- Outstanding — All required lessons completed
- Outstanding — All required practical assessments passed
- Outstanding — A recorded assessment decision exists for every required task
- Outstanding — All requested corrections completed
- Outstanding — Course content professionally reviewed and signed off
- Outstanding — Authorised reviewer has approved completion
- Outstanding — Course certificate policy approved
- Outstanding — Certificate wording approved by Ideeplan Consult
- Outstanding — Course is officially available
- Outstanding — Unique certificate numbering and a secure verification route configured
Practical resources
Resources for this course
13 resource records · 13 with a written preview · 0 with a file under preparation · Download access not yet enabled.
All demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult and is labelled as demonstration material. No confidential client file, personal information, private agency document or unreleased project drawing is used.
- Written preview available — downloadable file not yet available
Practical project brief
Sets the professional situation, the role the learner takes and what must be produced.
- Resource type
- Brief
- Format
- Written brief shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — One brief governs the whole course: every lesson exercise contributes to the same final deliverable.
- Access
- No account required — written preview is public
- A synthetic 12-hectare gently sloping residential site with a watercourse to one boundary and mixed ground conditions.
- Your role: Planning and masterplanning lead preparing the concept surface-water strategy with the design team.
- Available information: Synthetic topographic surface and levels data.
- Available information: Soil, infiltration indicator and groundwater teaching notes.
- Available information: Existing watercourse, outfall and downstream context.
- Available information: Draft residential layout and Ideeplan-owned strategy templates.
- Required analysis: Sub-catchment and flow-path delineation.
- Required analysis: Infiltration potential zoning with testing requirements.
- Required analysis: Discharge option appraisal against the hierarchy.
- Required analysis: Management-train selection and indicative sizing.
- Required analysis: Exceedance routing and maintenance planning.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Client-style instruction and problem statement
Gives the learner the instruction as a practitioner would receive it, and names the problem to be solved.
- Resource type
- Brief
- Format
- Written statement shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — Scenario framing applies to every lesson in the course.
- Access
- No account required — written preview is public
Synthetic 12-hectare site pack: topographic surface, soil and infiltration indicator layers, an existing watercourse and outfall, a synthetic groundwater note, and a draft residential layout with roads, plots and open space.
Drainage is often treated as an engineering afterthought, producing tanks under car parks and a layout that had no room for water. The professional problem is to integrate a surface-water strategy into the concept layout early, at the right level of detail, without overstating certainty.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 1 learner worksheet — Module 1 — Reading water on the site
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Catchment and flow-path plan with an outfall and infiltration options assessment.
- Lessons supported
- 3 — Supports the 3 lessons in module 1, which build one shared output.
- Access
- No account required — written preview is public
- Catchments, flow paths and low points — Delineate sub-catchments and flow paths for the teaching site and mark every ponding low point.
- Ground conditions, infiltration and groundwater — Assess infiltration potential across the site by zone and state the testing required to confirm each.
- Outfalls, discharge hierarchy and receiving capacity — Evaluate three discharge options for the site and rank them with reasons and consent requirements.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 2 learner worksheet — Module 2 — Concept components and indicative sizing
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Component selection schedule with indicative sizing and locations.
- Lessons supported
- 3 — Supports the 3 lessons in module 2, which build one shared output.
- Access
- No account required — written preview is public
- The management train and component selection — Build a management train for two sub-catchments and justify each component against site conditions.
- Indicative sizing and the assumptions behind it — Produce indicative storage requirements per sub-catchment with every assumption listed.
- Exceedance, maintenance and long-term stewardship — Map exceedance routes across the layout and draft a maintenance and adoption note for each component type.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 3 learner worksheet — Module 3 — Integration, drawing and reporting
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water strategy drawing and supporting strategy note.
- Lessons supported
- 3 — Supports the 3 lessons in module 3, which build one shared output.
- Access
- No account required — written preview is public
- Integrating drainage with layout and open space — Revise the draft layout to accommodate the drainage concept and record each layout change made.
- Drawing the concept strategy — Produce the concept drainage strategy drawing with full annotation and a component key.
- Writing the strategy note and specialist handover — Write the strategy note including an assumptions register and a specialist confirmation schedule.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Task checklist
Confirms every required piece of work has been produced before submission.
- Resource type
- Checklist
- Format
- Written checklist shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — A single task checklist tracks progress across all modules.
- Access
- No account required — written preview is public
- Catchment and flow-path plan.
- Component selection and indicative sizing schedule.
- Revised layout accommodating drainage.
- Annotated concept drainage strategy drawing.
- Strategy note with assumptions register and specialist confirmation schedule.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Example data and drawing base
Synthetic topographic surface, soil and infiltration indicator layers, a teaching watercourse and outfall, and a groundwater-level note. GIS exercises are planned around plain, checkable formats: CSV and clearly labelled local-grid JSON on the named grid IDP-LOCAL-GRID. GeoJSON is not used for local-grid training data because the format asserts WGS 84 degrees. No QGIS project file, GeoPackage or raster file is claimed.
- Resource type
- GIS exercise pack
- Format
- CSV and local-grid JSON (planned) — no GeoJSON, QGIS project, GeoPackage or raster file is claimed
- Status
- Planned
- Data classification
- Synthetic demonstration data
- Licence or ownership
- Synthetic demonstration material prepared by Ideeplan Consult. No client file, personal information, private agency document or unreleased project drawing is used.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — One demonstration data base is used by every lesson so results stay comparable.
- Access
- No account required — written preview is public
Demonstration data item What it contains and how it is used Data ownership and licence Synthetic training data prepared and owned by Ideeplan Consult. It is fictional: it is not a real client project, a real site or a real location, and it must not be presented as one. Free to study on this page; redistribution is not permitted. Module 1 input — Module 1 — Reading water on the site Synthetic topographic surface, soil and infiltration indicator layers, a teaching watercourse and outfall, and a groundwater-level note. Module 2 input — Module 2 — Concept components and indicative sizing Ideeplan-owned component-selection matrix, a teaching indicative-sizing worksheet and the draft residential layout. Module 3 input — Module 3 — Integration, drawing and reporting Draft layout, green-infrastructure and open-space layers, and an Ideeplan-owned concept drainage-strategy template. Lawful sourcing where real data is substituted Where a learner substitutes real data, use only openly licensed or lawfully obtained sources, record the publisher, dataset title, version and access date, and cite them in the final deliverable. Do not use restricted, confidential or personal data. Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Analysis and calculation template
Structures the analysis so assumptions are visible and checkable. Any figures used in a template are teaching assumptions, not market evidence. Local costs, policies, standards and valuation assumptions must be independently confirmed before any of this is applied to a real project.
- Resource type
- Suitability matrix
- Format
- CSV matrix (planned)
- Status
- Planned
- Data classification
- Synthetic demonstration data
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — The same analysis structure is completed progressively through the course.
- Access
- No account required — written preview is public
- Record every assumption on its own labelled row, with the source or reason beside it.
- Module 1 working section — Catchment and flow-path plan with an outfall and infiltration options assessment.
- Module 2 working section — Component selection schedule with indicative sizing and locations.
- Module 3 working section — Concept surface-water strategy drawing and supporting strategy note.
- Required output carried into the analysis — Catchment and flow-path plan.
- Required output carried into the analysis — Component selection and indicative sizing schedule.
- Required output carried into the analysis — Revised layout accommodating drainage.
- Required output carried into the analysis — Annotated concept drainage strategy drawing.
- Required output carried into the analysis — Strategy note with assumptions register and specialist confirmation schedule.
- Check row: totals, units and areas reconcile before the result is carried into the deliverable.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Final deliverable template
Sets the expected structure and presentation standard for Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note.
- Resource type
- Site plan base
- Format
- PDF and DXF (planned)
- Status
- Planned
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — The final deliverable draws on every module output.
- Access
- No account required — written preview is public
- Final named deliverable — Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Section 1 — Catchment and flow-path plan with an outfall and infiltration options assessment.
- Section 2 — Component selection schedule with indicative sizing and locations.
- Section 3 — Concept surface-water strategy drawing and supporting strategy note.
- Must be present — Catchment and flow-path plan.
- Must be present — Component selection and indicative sizing schedule.
- Must be present — Revised layout accommodating drainage.
- Must be present — Annotated concept drainage strategy drawing.
- Must be present — Strategy note with assumptions register and specialist confirmation schedule.
- Presentation and submission standard — Concept-stage labelling throughout, flow direction shown on every drawing, assumptions listed with figures, and no implication of detailed engineering design.
- Sources and citations: list every dataset, publisher, version and access date used, and state clearly where synthetic Ideeplan training data was used.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Quality-control checklist
Professional checks to run before the work is treated as finished.
- Resource type
- Checklist
- Format
- Written checklist shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — Quality control is applied to the whole submission, not to a single lesson.
- Access
- No account required — written preview is public
- Upstream contributing area is shown separately from on-site runoff.
- Every infiltration judgement is marked indicative with a testing requirement.
- Each management train starts with source control.
- Exceedance routes avoid buildings and are drawn on the strategy plan.
- Local drainage standards, discharge rates, climate allowances, adoption policies and consenting requirements are confirmed with the relevant authority and a qualified drainage engineer before design.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Marking and review rubric
States what a satisfactory professional standard looks like for each criterion.
- Resource type
- Marking rubric
- Format
- Written rubric shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — One rubric reviews the final deliverable produced across all modules.
- Access
- No account required — written preview is public
Criterion Satisfactory standard Site reading Catchments, flow paths and upstream contribution are correctly identified. Hierarchy discipline Discharge options follow the hierarchy with reasons for each rejection. Assumption transparency Every indicative figure names the assumption behind it. Design integration The layout was revised so drainage features add amenity or habitat value. Scope honesty The strategy names what specialist design must confirm and claims nothing more. Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Correction-task sheet
Common professional mistakes and the correction the learner practises.
- Resource type
- Correction-task sheet
- Format
- Written task sheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — Correction tasks address mistakes that can appear anywhere in the course.
- Access
- No account required — written preview is public
- Proposing infiltration across the whole site from a soil map alone. — Zone infiltration potential as indicative, set a testing requirement and provide an alternative discharge route.
- Placing a single detention basin at the low point with no source control. — Rebuild as a management train with source and site control and resize the basin accordingly.
- Routing exceedance flow between two rows of dwellings. — Re-route through open space or a designed corridor and amend the layout to keep it clear.
- Presenting indicative storage volumes as final design figures. — Label them indicative, attach the assumptions register and add the specialist confirmation item.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Submission guidance
How the finished work should be assembled and presented for professional review.
- Resource type
- Checklist
- Format
- Written guidance shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
- Lessons supported
- 9 — Submission guidance covers the single final deliverable.
- Access
- No account required — written preview is public
Concept-stage labelling throughout, flow direction shown on every drawing, assumptions listed with figures, and no implication of detailed engineering design.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
Media status
Video lessons for this course
- Video lessons
- Video lesson: Not recorded — authentic professional recording required.
- Narration
- Professional narration — planned, not produced
- Captions
- Not yet produced
- Transcript
- Not yet produced
- Software demonstration
- Genuine screen capture from the real application only — no mockup, simulated interface or AI-generated screen.
- Software version and operating system
- No software version is published until it has been read from the actual recorded session. Until then the version reads “To be stated from the recorded session”.
- Production plan
- Prepared for professional review
- Enrolment, payment and downloads
- Disabled
Video lesson: Not recorded — authentic professional recording required. The written lesson on this page is complete and can be read in full without a video, an account, enrolment or payment.
Authentic software screen capture only — non-negotiable standard
Applies to every software demonstrated in the Academy, including AutoCAD, QGIS, Revit, ArcGIS, SketchUp, Lumion, Civil 3D, Rhino and any other software used. The final video must accurately represent what a learner sees when using the stated software version.
- Every demonstration is a genuine screen recording or screenshot captured from the actual installed software being taught.
- The exact software name, version, operating system and relevant workspace are stated on screen and in the lesson notes, as read from the recorded session.
- The real interface is shown: menus, panels, toolbars, properties, layer controls, settings and the command line or log.
- The real cursor, tool selection, commands, settings and the resulting output are visible.
- Capture is 16:9 and readable at 720p, with clear, unhurried cursor movement; the screen stays clear enough for learners to follow.
- The view zooms in whenever text, settings, coordinates or field values would otherwise be hard to read.
- The exact command, menu path or tool name is shown as it appears in the software.
- Useful keyboard shortcuts are shown alongside the menu path, never instead of it.
- Differences between software versions or operating systems are stated wherever the interface may display differently.
- Steps are numbered on screen, with callouts pointing at the actual control being used.
- Any annotation is added only after recording and must never alter or misrepresent the software interface.
- Captions and a complete transcript are produced before professional review.
- Any presenter window stays small, is positioned clear of technical content, and is hidden on mobile widths and on dense technical screens.
Interface visibility on every recording
- The full application interface is shown at the beginning of every demonstration, with the application identity and exact version clearly visible.
- The relevant menu bar, ribbon, toolbar or toolbox stays visible while each step is explained; the interface context is never cropped away.
- Layers, properties, project browser or data panels are shown wherever applicable.
- The command line, status bar or coordinate/CRS information is shown wherever relevant.
- Real cursor movement and visible clicks are captured, with visible cursor highlighting or click indicators.
- The selected tool and its effect are visible, and complete dialog boxes and settings are shown whenever one is opened.
- The resulting drawing, map, model or output is shown in the recording.
- Zoom is used only when necessary for small text or settings, always retaining enough context to identify the application and tool in use.
- The standard applies to every software course and is verified before any video is marked recorded or approved; if the required authentic interface is not visible, the lesson remains “Video lesson: Not recorded — authentic professional recording required.”
Never used
- Generic website mockups standing in for a software workspace.
- Simulated, redrawn, reconstructed or redesigned replica interfaces for any software.
- AI-generated software screens, panels, dialogs or map canvases.
- Generic illustrations replacing the real interface.
- Unverified screenshots taken from any source other than the recorded session.
- Fake video players, placeholder thumbnails or invented durations.
- Invented menus, tool names, command names, dialog options or keyboard shortcuts.
- Hiding important controls or covering them with a presenter window.
- Annotations that alter or misrepresent the recorded software interface.
- Claiming or implying that a simulated screen is an authentic software demonstration.
QGIS — what the recording must show
Exact QGIS version to be stated from the recorded session. Operating system to be stated from the recorded session; menu positions and file dialogs differ between systems.
- 1.Project CRS: Project Properties, the CRS tab and the selected coordinate reference system.
- 2.Layer loading: the Data Source Manager or Browser panel and the layer added to the canvas.
- 3.Layer properties: the Layer Properties dialog and each tab used in the lesson.
- 4.Symbology: the Symbology tab with the real renderer, classes and colour settings.
- 5.Attribute tables: the attribute table, field values, selection and expression use.
- 6.Processing tools: the Processing Toolbox with the tool searched and opened by its real name.
- 7.Analysis settings: every parameter in the tool dialog, including output location.
- 8.Map layout: the Print Layout window, page setup and map item.
- 9.Legend, scale and north arrow: each item added from the real layout toolbar.
- 10.Export and quality checks: the export dialog settings and a check of the exported file.
No authentic software recording or screenshot exists yet. Every software lesson remains “Video lesson: Not recorded — authentic professional recording required.”
Real professional classroom experience — every lesson
Applies to every future Academy lesson, software-based or not. The finished lesson presents as authentic professional training, professionally narrated and screen-led: video + written guide + supporting data + practical task + quality checklist + final named deliverable.
Lesson structure
- 1.Professional introduction.
- 2.Realistic project situation.
- 3.Learner role within that situation.
- 4.Problem statement.
- 5.Learning objectives.
- 6.Required software and data.
- 7.Step-by-step demonstration.
- 8.Explanation of the professional reasoning behind each action.
- 9.Practical learner task.
- 10.Checkpoint or pause activity.
- 11.Common mistake and its correction.
- 12.Quality-control review.
- 13.Final recap.
- 14.Named learner deliverable.
Video requirements
- Professional narration that is clear, natural and paced for instruction, synchronised with the screen action.
- Authentic screen recording from the actual software, with visible menus, tools, panels, commands, settings and outputs.
- Natural cursor movement and deliberate pacing, with a clear explanation of why each action is taken.
- Realistic corrections and troubleshooting shown, not edited away.
- Clear 16:9 screen capture.
- Captions and a complete transcript.
- Chapter titles and lesson sections.
- A small presenter window only where useful; it never covers technical content and is hidden on mobile or dense technical screens.
Never produced as a lesson
- Automated slideshows.
- Generic screen tours.
- Silent software demonstrations.
- Marketing videos presented as lessons.
- AI-avatar presentations.
- Simulated software tutorials.
- Fast montages without explanation.
- An invented tutor, instructor identity, voice, recording, thumbnail or completion status.
Lessons use only synthetic, publicly licensed or Ideeplan-owned examples. No confidential client information is used.
No genuine professional recording exists yet. Until one does, every lesson remains “Video lesson: Not recorded — authentic professional recording required.” Enrolment, payments, certificates and protected learner access stay disabled during this production stage.
Professional narration and screen-first production
- Every Academy lesson is planned as a professionally narrated, screen-led practical lesson with captions and a complete transcript.
- No AI avatar, virtual presenter or artificial talking head is used, and no named person is imitated. No lesson is described as human-narrated, instructor-led by a named person or personally presented unless that is factually true.
- No instructor identity is published until a real, named professional has recorded and approved the lesson.
- Recordings are screen-first: the GIS view, planning drawing, AutoCAD or Revit workspace or document remains the main subject of the frame.
- Any presenter picture-in-picture normally occupies about 8–10% of the frame, never covers technical content, and is reduced or hidden on small screens.
- The Principal Consultant portrait is reserved for approved introductions and conclusions. It is never used as a repeated course thumbnail, and the Academy remains company-first.
No lesson has been recorded and no narration has been produced. Scripts exist as production plans only, and every lesson video status remains “Not recorded”.
Demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult. No confidential client file, unauthorised agency dataset or private project information is used.
Methods are jurisdiction-neutral. Learners must confirm local laws, policies and technical standards before applying them to a real project.
A production plan describes how a lesson would be recorded. It is not a recording, and it does not create an enrolment, account, payment or reserved place.
9 lesson production plans · suggested recording time about 90 minutes in total (a planning estimate, not a recorded duration) · every lesson video status: Not recorded.
Lesson 1 · Video lesson: Not recorded — authentic professional recording required.
Catchments, flow paths and low points
- Learning objective
- Deriving sub-catchments and overland flow paths from terrain, distinguishing on-site from upstream contributing area, identifying ponding low points, and recognising flow routes that a layout must not block.
- Narration focus
- Understand how water arrives, moves and leaves before proposing anything.
- Screen action
- Delineate sub-catchments and flow paths for the teaching site and mark every ponding low point.
- Required software
- QGIS, CAD or drawing software, Spreadsheet software, Word processor
- Example data
- Synthetic topographic surface, soil and infiltration indicator layers, a teaching watercourse and outfall, and a groundwater-level note.
- Expected learner output
- Upstream contributing area is identified separately from on-site runoff.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Deriving sub-catchments and overland flow paths from terrain, distinguishing on-site from upstream contributing area, identifying ponding low points, and recognising flow routes that a layout must not block.
- 2.Delineate sub-catchments and flow paths for the teaching site and mark every ponding low point.
- 3.Upstream contributing area is identified separately from on-site runoff.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, CAD or drawing software, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 2 · Video lesson: Not recorded — authentic professional recording required.
Ground conditions, infiltration and groundwater
- Learning objective
- Reading soil and geology indicators as a first view on infiltration, the significance of groundwater levels and contamination for infiltration, and why an indicator layer never replaces on-site testing.
- Narration focus
- Understand how water arrives, moves and leaves before proposing anything.
- Screen action
- Assess infiltration potential across the site by zone and state the testing required to confirm each.
- Required software
- QGIS, CAD or drawing software, Spreadsheet software, Word processor
- Example data
- Synthetic topographic surface, soil and infiltration indicator layers, a teaching watercourse and outfall, and a groundwater-level note.
- Expected learner output
- Every infiltration judgement is labelled indicative and paired with a testing requirement.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Reading soil and geology indicators as a first view on infiltration, the significance of groundwater levels and contamination for infiltration, and why an indicator layer never replaces on-site testing.
- 2.Assess infiltration potential across the site by zone and state the testing required to confirm each.
- 3.Every infiltration judgement is labelled indicative and paired with a testing requirement.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, CAD or drawing software, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 3 · Video lesson: Not recorded — authentic professional recording required.
Outfalls, discharge hierarchy and receiving capacity
- Learning objective
- The order of preference from infiltration to watercourse to sewer, identifying viable outfall points and their levels, the meaning of restricted discharge rates, and the downstream consequences of getting it wrong.
- Narration focus
- Understand how water arrives, moves and leaves before proposing anything.
- Screen action
- Evaluate three discharge options for the site and rank them with reasons and consent requirements.
- Required software
- QGIS, CAD or drawing software, Spreadsheet software, Word processor
- Example data
- Synthetic topographic surface, soil and infiltration indicator layers, a teaching watercourse and outfall, and a groundwater-level note.
- Expected learner output
- The ranking follows the hierarchy and each option names the consent or agreement needed.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.The order of preference from infiltration to watercourse to sewer, identifying viable outfall points and their levels, the meaning of restricted discharge rates, and the downstream consequences of getting it wrong.
- 2.Evaluate three discharge options for the site and rank them with reasons and consent requirements.
- 3.The ranking follows the hierarchy and each option names the consent or agreement needed.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, CAD or drawing software, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 4 · Video lesson: Not recorded — authentic professional recording required.
The management train and component selection
- Learning objective
- Source control, site control and regional control in sequence; permeable surfaces, swales, filter strips, rain gardens, basins, ponds and wetlands; and matching components to gradient, ground conditions and available space.
- Narration focus
- Choose and size components that suit the site, the layout and long-term maintenance.
- Screen action
- Build a management train for two sub-catchments and justify each component against site conditions.
- Required software
- QGIS, CAD or drawing software, Spreadsheet software, Word processor
- Example data
- Ideeplan-owned component-selection matrix, a teaching indicative-sizing worksheet and the draft residential layout.
- Expected learner output
- Each train begins with source control rather than a single end-of-pipe feature.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Source control, site control and regional control in sequence; permeable surfaces, swales, filter strips, rain gardens, basins, ponds and wetlands; and matching components to gradient, ground conditions and available space.
- 2.Build a management train for two sub-catchments and justify each component against site conditions.
- 3.Each train begins with source control rather than a single end-of-pipe feature.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, CAD or drawing software, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 5 · Video lesson: Not recorded — authentic professional recording required.
Indicative sizing and the assumptions behind it
- Learning objective
- Concept-stage volume estimation, impermeable area assumptions, the role of greenfield runoff rates and climate allowances, and expressing sizing as a spatial requirement rather than a final engineering figure.
- Narration focus
- Choose and size components that suit the site, the layout and long-term maintenance.
- Screen action
- Produce indicative storage requirements per sub-catchment with every assumption listed.
- Required software
- QGIS, CAD or drawing software, Spreadsheet software, Word processor
- Example data
- Ideeplan-owned component-selection matrix, a teaching indicative-sizing worksheet and the draft residential layout.
- Expected learner output
- Every figure is accompanied by its assumption and labelled indicative.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Concept-stage volume estimation, impermeable area assumptions, the role of greenfield runoff rates and climate allowances, and expressing sizing as a spatial requirement rather than a final engineering figure.
- 2.Produce indicative storage requirements per sub-catchment with every assumption listed.
- 3.Every figure is accompanied by its assumption and labelled indicative.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, CAD or drawing software, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 6 · Video lesson: Not recorded — authentic professional recording required.
Exceedance, maintenance and long-term stewardship
- Learning objective
- Designing safe exceedance routes for events beyond the design standard, keeping flow paths out of buildings, and planning access, adoption and maintenance responsibility from the outset.
- Narration focus
- Choose and size components that suit the site, the layout and long-term maintenance.
- Screen action
- Map exceedance routes across the layout and draft a maintenance and adoption note for each component type.
- Required software
- QGIS, CAD or drawing software, Spreadsheet software, Word processor
- Example data
- Ideeplan-owned component-selection matrix, a teaching indicative-sizing worksheet and the draft residential layout.
- Expected learner output
- No exceedance route passes through a proposed dwelling or blocked corridor.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Designing safe exceedance routes for events beyond the design standard, keeping flow paths out of buildings, and planning access, adoption and maintenance responsibility from the outset.
- 2.Map exceedance routes across the layout and draft a maintenance and adoption note for each component type.
- 3.No exceedance route passes through a proposed dwelling or blocked corridor.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, CAD or drawing software, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 7 · Video lesson: Not recorded — authentic professional recording required.
Integrating drainage with layout and open space
- Learning objective
- Making basins and swales usable amenity and habitat space, avoiding fenced-off residual land, coordinating with levels, roads, plots and services, and revising the layout where drainage demands it.
- Narration focus
- Make drainage part of the place, then document the strategy honestly.
- Screen action
- Revise the draft layout to accommodate the drainage concept and record each layout change made.
- Required software
- QGIS, CAD or drawing software, Spreadsheet software, Word processor
- Example data
- Draft layout, green-infrastructure and open-space layers, and an Ideeplan-owned concept drainage-strategy template.
- Expected learner output
- Drainage features contribute amenity or habitat value, not only storage.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Making basins and swales usable amenity and habitat space, avoiding fenced-off residual land, coordinating with levels, roads, plots and services, and revising the layout where drainage demands it.
- 2.Revise the draft layout to accommodate the drainage concept and record each layout change made.
- 3.Drainage features contribute amenity or habitat value, not only storage.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, CAD or drawing software, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 8 · Video lesson: Not recorded — authentic professional recording required.
Drawing the concept strategy
- Learning objective
- What a concept drainage drawing must show: catchments, components, flow direction, exceedance routes, outfall, indicative levels and areas; conventions and annotation; and the difference from a detailed drainage design drawing.
- Narration focus
- Make drainage part of the place, then document the strategy honestly.
- Screen action
- Produce the concept drainage strategy drawing with full annotation and a component key.
- Required software
- QGIS, CAD or drawing software, Spreadsheet software, Word processor
- Example data
- Draft layout, green-infrastructure and open-space layers, and an Ideeplan-owned concept drainage-strategy template.
- Expected learner output
- The drawing is clearly labelled concept stage and shows flow direction throughout.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.What a concept drainage drawing must show: catchments, components, flow direction, exceedance routes, outfall, indicative levels and areas; conventions and annotation; and the difference from a detailed drainage design drawing.
- 2.Produce the concept drainage strategy drawing with full annotation and a component key.
- 3.The drawing is clearly labelled concept stage and shows flow direction throughout.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, CAD or drawing software, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 9 · Video lesson: Not recorded — authentic professional recording required.
Writing the strategy note and specialist handover
- Learning objective
- Structuring the note, stating assumptions and standards used, listing every item requiring specialist confirmation, and writing a handover that a drainage engineer can pick up without reverse-engineering the concept.
- Narration focus
- Make drainage part of the place, then document the strategy honestly.
- Screen action
- Write the strategy note including an assumptions register and a specialist confirmation schedule.
- Required software
- QGIS, CAD or drawing software, Spreadsheet software, Word processor
- Example data
- Draft layout, green-infrastructure and open-space layers, and an Ideeplan-owned concept drainage-strategy template.
- Expected learner output
- The note states plainly that it is not a detailed drainage design.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Structuring the note, stating assumptions and standards used, listing every item requiring specialist confirmation, and writing a handover that a drainage engineer can pick up without reverse-engineering the concept.
- 2.Write the strategy note including an assumptions register and a specialist confirmation schedule.
- 3.The note states plainly that it is not a detailed drainage design.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to QGIS, CAD or drawing software, Spreadsheet software, Word processor, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Course production standard
- Recordings are screen-first: the planning drawing, GIS view, AutoCAD or Revit workspace stays the main subject of the frame.
- Any presenter picture-in-picture normally occupies no more than about 8–10% of the frame and never covers maps, legends, drawings, dimensions or annotations.
- On mobile and on dense technical screens the presenter window is reduced further or hidden entirely.
- The Principal Consultant portrait is reserved for approved introductions, explanations and conclusions. It is not used as a generic thumbnail for every course.
- Narration is planned for professional human delivery. No AI narration, AI presenter or recorded lesson exists today.
No lesson has been recorded. Every lesson media status is “Not recorded”.
Any example data used in teaching is synthetic, publicly licensed or owned by Ideeplan Consult, and is clearly labelled as demonstration data. No client file, confidential document or unauthorised project material is used.
Want this course finished first?
Registering interest is not an enrolment. It tells Ideeplan Consult which subjects to complete and review first.