SuDS, Drainage and Stormwater Concept Strategy

Develop a concept-stage surface-water strategy that shapes the layout instead of being retrofitted into leftover corners.

Catalogue status: PlannedProfessional review: Not yet reviewed

Written teaching content: available for review

Video lessons have not yet been recorded. Written teaching content may be available for review below.

Written teaching content only. This course is not yet available: it has not been professionally reviewed, no lesson is recorded, and enrolment, payment, certificates, downloads and protected access are all disabled.

Review Written Course Content

Reading only. This is not enrolment, booking, purchase, account access, a download or protected learning access.

  • Written content: Available for review
  • Video lessons: Not recorded
  • Professional review: Not yet completed
  • Enrolment: Not available
  • Payment: Disabled
  • Certificates: Disabled
  • Downloads: Disabled
  • Protected access: Disabled

Written course content

Client-style brief

A residential scheme on a gently sloping site must show, at concept stage, how surface water will be managed without increasing risk downstream. The team needs a drainage concept strategy that fits the layout, uses surface features where possible, states its assumptions and identifies what the drainage engineer must confirm.

Professional scenario

Synthetic 12-hectare site pack: topographic surface, soil and infiltration indicator layers, an existing watercourse and outfall, a synthetic groundwater note, and a draft residential layout with roads, plots and open space.

Planning problem

Drainage is often treated as an engineering afterthought, producing tanks under car parks and a layout that had no room for water. The professional problem is to integrate a surface-water strategy into the concept layout early, at the right level of detail, without overstating certainty.

Learning objectives

  • Read a site's drainage catchments, flow paths and outfall options.
  • Apply the drainage hierarchy and select appropriate concept components.
  • Size and locate features indicatively with stated assumptions.
  • Integrate drainage into layout, open space and green infrastructure.
  • Produce a concept strategy that names what specialist design must confirm.

Modules and lessons

0 of 9 lessons open

  1. Module 1

    Module 1 — Reading water on the site

    Understand how water arrives, moves and leaves before proposing anything.

    Example data: Synthetic topographic surface, soil and infiltration indicator layers, a teaching watercourse and outfall, and a groundwater-level note.

    Module output: Catchment and flow-path plan with an outfall and infiltration options assessment.

  2. Module 2

    Module 2 — Concept components and indicative sizing

    Choose and size components that suit the site, the layout and long-term maintenance.

    Example data: Ideeplan-owned component-selection matrix, a teaching indicative-sizing worksheet and the draft residential layout.

    Module output: Component selection schedule with indicative sizing and locations.

  3. Module 3

    Module 3 — Integration, drawing and reporting

    Make drainage part of the place, then document the strategy honestly.

    Example data: Draft layout, green-infrastructure and open-space layers, and an Ideeplan-owned concept drainage-strategy template.

    Module output: Concept surface-water strategy drawing and supporting strategy note.

Project brief

A synthetic 12-hectare gently sloping residential site with a watercourse to one boundary and mixed ground conditions.

Your role: Planning and masterplanning lead preparing the concept surface-water strategy with the design team.

Information available

  • Synthetic topographic surface and levels data.
  • Soil, infiltration indicator and groundwater teaching notes.
  • Existing watercourse, outfall and downstream context.
  • Draft residential layout and Ideeplan-owned strategy templates.

Required analysis

  • Sub-catchment and flow-path delineation.
  • Infiltration potential zoning with testing requirements.
  • Discharge option appraisal against the hierarchy.
  • Management-train selection and indicative sizing.
  • Exceedance routing and maintenance planning.

Required outputs

  • Catchment and flow-path plan.
  • Component selection and indicative sizing schedule.
  • Revised layout accommodating drainage.
  • Annotated concept drainage strategy drawing.
  • Strategy note with assumptions register and specialist confirmation schedule.

Presentation standard: Concept-stage labelling throughout, flow direction shown on every drawing, assumptions listed with figures, and no implication of detailed engineering design.

Marking criteria

  • Site reading: Catchments, flow paths and upstream contribution are correctly identified.
  • Hierarchy discipline: Discharge options follow the hierarchy with reasons for each rejection.
  • Assumption transparency: Every indicative figure names the assumption behind it.
  • Design integration: The layout was revised so drainage features add amenity or habitat value.
  • Scope honesty: The strategy names what specialist design must confirm and claims nothing more.

Quality-assurance checklist

  • Upstream contributing area is shown separately from on-site runoff.
  • Every infiltration judgement is marked indicative with a testing requirement.
  • Each management train starts with source control.
  • Exceedance routes avoid buildings and are drawn on the strategy plan.
  • Local drainage standards, discharge rates, climate allowances, adoption policies and consenting requirements are confirmed with the relevant authority and a qualified drainage engineer before design.

Common mistakes and correction tasks

  • Proposing infiltration across the whole site from a soil map alone. Correction: Zone infiltration potential as indicative, set a testing requirement and provide an alternative discharge route.
  • Placing a single detention basin at the low point with no source control. Correction: Rebuild as a management train with source and site control and resize the basin accordingly.
  • Routing exceedance flow between two rows of dwellings. Correction: Re-route through open space or a designed corridor and amend the layout to keep it clear.
  • Presenting indicative storage volumes as final design figures. Correction: Label them indicative, attach the assumptions register and add the specialist confirmation item.

Enrolment status

Enrolment is not currently available. This course is still undergoing content, media and professional review.

Register Interest is an expression of interest only. It works without an account, creates no enrolment, no reserved place and no payment order.

Protected lessons, approved videos and approved resource files are not accessible. No protected file URL, signed link or download entitlement is created.

Payments are disabled. No price, checkout, payment provider, payment order or paid-course claim exists in the Academy.

Outstanding before enrolment could open

  • Outstanding — Professional content review is complete
  • Outstanding — Required videos recorded, reviewed and approved, or the course approved as written-only
  • Outstanding — Required practical resources approved and available
  • Outstanding — Learner terms approved
  • Outstanding — Privacy and data-handling requirements approved
  • Outstanding — Course availability explicitly enabled by an authorised administrator
  • Outstanding — Payment and refund terms approved (paid courses)
  • Outstanding — Payment provider configuration complete (where payment is required)
  • Outstanding — Authentication email delivery configured and tested
  • Outstanding — Protected content access tested
  • Outstanding — Approved delivery and support process in place

Progress, assessment and certificates

Submission access is not currently available

Lesson and course progress tracking is not active. No progress record, completion percentage or completed lesson exists for any account, and no course can record progress until enrolment opens.

Practical assessments cannot be submitted. Submission access is not currently available: there is no active enrolment, no upload configuration and no authorised reviewer workflow in operation.

No assessment has been marked, reviewed, corrected or passed. Reviewer feedback, correction tasks and pass decisions are made by an authorised human reviewer and none exists.

No certificate is issued, approved or pending. A future Academy certificate would be a course-completion certificate only — not a professional licence, statutory qualification, accreditation or government-recognised award.

Certificate verification is disabled until a certificate is genuinely issued. No verification result is produced for any reference.

Assessment formats planned for the Academy

Written briefs, required deliverables and marking criteria are published inside the course content above for open review. None of them can be submitted or marked at present.

  • Practical planning task
  • GIS mapping exercise
  • Site-appraisal task
  • Feasibility assessment
  • CAD or drawing task
  • Revit coordination task
  • Planning-report task
  • Policy-assessment task
  • Transport or access analysis
  • Environmental or green-infrastructure exercise
  • Final course project

Outstanding before completion or a certificate could exist

  • Outstanding — Learner identity verified by an authorised member of staff
  • Outstanding — Learner holds a valid active or completed enrolment
  • Outstanding — All required lessons completed
  • Outstanding — All required practical assessments passed
  • Outstanding — A recorded assessment decision exists for every required task
  • Outstanding — All requested corrections completed
  • Outstanding — Course content professionally reviewed and signed off
  • Outstanding — Authorised reviewer has approved completion
  • Outstanding — Course certificate policy approved
  • Outstanding — Certificate wording approved by Ideeplan Consult
  • Outstanding — Course is officially available
  • Outstanding — Unique certificate numbering and a secure verification route configured

Practical resources

Resources for this course

13 resource records · 13 with a written preview · 0 with a file under preparation · Download access not yet enabled.

All demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult and is labelled as demonstration material. No confidential client file, personal information, private agency document or unreleased project drawing is used.

  • Practical project brief

    Sets the professional situation, the role the learner takes and what must be produced.

    Written preview available — downloadable file not yet available
    Resource type
    Brief
    Format
    Written brief shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — One brief governs the whole course: every lesson exercise contributes to the same final deliverable.
    Access
    No account required — written preview is public
    • A synthetic 12-hectare gently sloping residential site with a watercourse to one boundary and mixed ground conditions.
    • Your role: Planning and masterplanning lead preparing the concept surface-water strategy with the design team.
    • Available information: Synthetic topographic surface and levels data.
    • Available information: Soil, infiltration indicator and groundwater teaching notes.
    • Available information: Existing watercourse, outfall and downstream context.
    • Available information: Draft residential layout and Ideeplan-owned strategy templates.
    • Required analysis: Sub-catchment and flow-path delineation.
    • Required analysis: Infiltration potential zoning with testing requirements.
    • Required analysis: Discharge option appraisal against the hierarchy.
    • Required analysis: Management-train selection and indicative sizing.
    • Required analysis: Exceedance routing and maintenance planning.

    Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.

  • Client-style instruction and problem statement

    Gives the learner the instruction as a practitioner would receive it, and names the problem to be solved.

    Written preview available — downloadable file not yet available
    Resource type
    Brief
    Format
    Written statement shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — Scenario framing applies to every lesson in the course.
    Access
    No account required — written preview is public
  • Module 1 learner worksheet — Module 1 — Reading water on the site

    Lists the practical steps the learner carries out in this module, in order.

    Written preview available — downloadable file not yet available
    Resource type
    Worksheet
    Format
    Written worksheet shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Catchment and flow-path plan with an outfall and infiltration options assessment.
    Lessons supported
    3 — Supports the 3 lessons in module 1, which build one shared output.
    Access
    No account required — written preview is public
  • Module 2 learner worksheet — Module 2 — Concept components and indicative sizing

    Lists the practical steps the learner carries out in this module, in order.

    Written preview available — downloadable file not yet available
    Resource type
    Worksheet
    Format
    Written worksheet shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Component selection schedule with indicative sizing and locations.
    Lessons supported
    3 — Supports the 3 lessons in module 2, which build one shared output.
    Access
    No account required — written preview is public
  • Module 3 learner worksheet — Module 3 — Integration, drawing and reporting

    Lists the practical steps the learner carries out in this module, in order.

    Written preview available — downloadable file not yet available
    Resource type
    Worksheet
    Format
    Written worksheet shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water strategy drawing and supporting strategy note.
    Lessons supported
    3 — Supports the 3 lessons in module 3, which build one shared output.
    Access
    No account required — written preview is public
  • Task checklist

    Confirms every required piece of work has been produced before submission.

    Written preview available — downloadable file not yet available
    Resource type
    Checklist
    Format
    Written checklist shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — A single task checklist tracks progress across all modules.
    Access
    No account required — written preview is public
  • Example data and drawing base

    Synthetic topographic surface, soil and infiltration indicator layers, a teaching watercourse and outfall, and a groundwater-level note. GIS exercises are planned around plain, checkable formats: CSV and clearly labelled local-grid JSON on the named grid IDP-LOCAL-GRID. GeoJSON is not used for local-grid training data because the format asserts WGS 84 degrees. No QGIS project file, GeoPackage or raster file is claimed.

    Written preview available — downloadable file not yet available
    Resource type
    GIS exercise pack
    Format
    CSV and local-grid JSON (planned) — no GeoJSON, QGIS project, GeoPackage or raster file is claimed
    Status
    Planned
    Data classification
    Synthetic demonstration data
    Licence or ownership
    Synthetic demonstration material prepared by Ideeplan Consult. No client file, personal information, private agency document or unreleased project drawing is used.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — One demonstration data base is used by every lesson so results stay comparable.
    Access
    No account required — written preview is public
  • Analysis and calculation template

    Structures the analysis so assumptions are visible and checkable. Any figures used in a template are teaching assumptions, not market evidence. Local costs, policies, standards and valuation assumptions must be independently confirmed before any of this is applied to a real project.

    Written preview available — downloadable file not yet available
    Resource type
    Suitability matrix
    Format
    CSV matrix (planned)
    Status
    Planned
    Data classification
    Synthetic demonstration data
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — The same analysis structure is completed progressively through the course.
    Access
    No account required — written preview is public
  • Final deliverable template

    Sets the expected structure and presentation standard for Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note.

    Written preview available — downloadable file not yet available
    Resource type
    Site plan base
    Format
    PDF and DXF (planned)
    Status
    Planned
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — The final deliverable draws on every module output.
    Access
    No account required — written preview is public
  • Quality-control checklist

    Professional checks to run before the work is treated as finished.

    Written preview available — downloadable file not yet available
    Resource type
    Checklist
    Format
    Written checklist shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — Quality control is applied to the whole submission, not to a single lesson.
    Access
    No account required — written preview is public
  • Marking and review rubric

    States what a satisfactory professional standard looks like for each criterion.

    Written preview available — downloadable file not yet available
    Resource type
    Marking rubric
    Format
    Written rubric shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — One rubric reviews the final deliverable produced across all modules.
    Access
    No account required — written preview is public
  • Correction-task sheet

    Common professional mistakes and the correction the learner practises.

    Written preview available — downloadable file not yet available
    Resource type
    Correction-task sheet
    Format
    Written task sheet shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — Correction tasks address mistakes that can appear anywhere in the course.
    Access
    No account required — written preview is public
  • Submission guidance

    How the finished work should be assembled and presented for professional review.

    Written preview available — downloadable file not yet available
    Resource type
    Checklist
    Format
    Written guidance shown on this page
    Status
    Draft
    Data classification
    Ideeplan-owned demonstration material
    Licence or ownership
    Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
    Related deliverable
    Concept surface-water and SuDS strategy: annotated strategy drawing, sizing schedule and strategy note
    Lessons supported
    9 — Submission guidance covers the single final deliverable.
    Access
    No account required — written preview is public

Media status

Video lessons for this course

Video lessons
Video lesson: Not recorded — authentic professional recording required.
Narration
Professional narration — planned, not produced
Captions
Not yet produced
Transcript
Not yet produced
Software demonstration
Genuine screen capture from the real application only — no mockup, simulated interface or AI-generated screen.
Software version and operating system
No software version is published until it has been read from the actual recorded session. Until then the version reads “To be stated from the recorded session”.
Production plan
Prepared for professional review
Enrolment, payment and downloads
Disabled

Video lesson: Not recorded — authentic professional recording required. The written lesson on this page is complete and can be read in full without a video, an account, enrolment or payment.

Authentic software screen capture only — non-negotiable standard

Applies to every software demonstrated in the Academy, including AutoCAD, QGIS, Revit, ArcGIS, SketchUp, Lumion, Civil 3D, Rhino and any other software used. The final video must accurately represent what a learner sees when using the stated software version.

  • Every demonstration is a genuine screen recording or screenshot captured from the actual installed software being taught.
  • The exact software name, version, operating system and relevant workspace are stated on screen and in the lesson notes, as read from the recorded session.
  • The real interface is shown: menus, panels, toolbars, properties, layer controls, settings and the command line or log.
  • The real cursor, tool selection, commands, settings and the resulting output are visible.
  • Capture is 16:9 and readable at 720p, with clear, unhurried cursor movement; the screen stays clear enough for learners to follow.
  • The view zooms in whenever text, settings, coordinates or field values would otherwise be hard to read.
  • The exact command, menu path or tool name is shown as it appears in the software.
  • Useful keyboard shortcuts are shown alongside the menu path, never instead of it.
  • Differences between software versions or operating systems are stated wherever the interface may display differently.
  • Steps are numbered on screen, with callouts pointing at the actual control being used.
  • Any annotation is added only after recording and must never alter or misrepresent the software interface.
  • Captions and a complete transcript are produced before professional review.
  • Any presenter window stays small, is positioned clear of technical content, and is hidden on mobile widths and on dense technical screens.

Interface visibility on every recording

  • The full application interface is shown at the beginning of every demonstration, with the application identity and exact version clearly visible.
  • The relevant menu bar, ribbon, toolbar or toolbox stays visible while each step is explained; the interface context is never cropped away.
  • Layers, properties, project browser or data panels are shown wherever applicable.
  • The command line, status bar or coordinate/CRS information is shown wherever relevant.
  • Real cursor movement and visible clicks are captured, with visible cursor highlighting or click indicators.
  • The selected tool and its effect are visible, and complete dialog boxes and settings are shown whenever one is opened.
  • The resulting drawing, map, model or output is shown in the recording.
  • Zoom is used only when necessary for small text or settings, always retaining enough context to identify the application and tool in use.
  • The standard applies to every software course and is verified before any video is marked recorded or approved; if the required authentic interface is not visible, the lesson remains “Video lesson: Not recorded — authentic professional recording required.”

Never used

  • Generic website mockups standing in for a software workspace.
  • Simulated, redrawn, reconstructed or redesigned replica interfaces for any software.
  • AI-generated software screens, panels, dialogs or map canvases.
  • Generic illustrations replacing the real interface.
  • Unverified screenshots taken from any source other than the recorded session.
  • Fake video players, placeholder thumbnails or invented durations.
  • Invented menus, tool names, command names, dialog options or keyboard shortcuts.
  • Hiding important controls or covering them with a presenter window.
  • Annotations that alter or misrepresent the recorded software interface.
  • Claiming or implying that a simulated screen is an authentic software demonstration.

QGIS — what the recording must show

Exact QGIS version to be stated from the recorded session. Operating system to be stated from the recorded session; menu positions and file dialogs differ between systems.

  1. 1.Project CRS: Project Properties, the CRS tab and the selected coordinate reference system.
  2. 2.Layer loading: the Data Source Manager or Browser panel and the layer added to the canvas.
  3. 3.Layer properties: the Layer Properties dialog and each tab used in the lesson.
  4. 4.Symbology: the Symbology tab with the real renderer, classes and colour settings.
  5. 5.Attribute tables: the attribute table, field values, selection and expression use.
  6. 6.Processing tools: the Processing Toolbox with the tool searched and opened by its real name.
  7. 7.Analysis settings: every parameter in the tool dialog, including output location.
  8. 8.Map layout: the Print Layout window, page setup and map item.
  9. 9.Legend, scale and north arrow: each item added from the real layout toolbar.
  10. 10.Export and quality checks: the export dialog settings and a check of the exported file.

No authentic software recording or screenshot exists yet. Every software lesson remains “Video lesson: Not recorded — authentic professional recording required.”

Real professional classroom experience — every lesson

Applies to every future Academy lesson, software-based or not. The finished lesson presents as authentic professional training, professionally narrated and screen-led: video + written guide + supporting data + practical task + quality checklist + final named deliverable.

Lesson structure

  1. 1.Professional introduction.
  2. 2.Realistic project situation.
  3. 3.Learner role within that situation.
  4. 4.Problem statement.
  5. 5.Learning objectives.
  6. 6.Required software and data.
  7. 7.Step-by-step demonstration.
  8. 8.Explanation of the professional reasoning behind each action.
  9. 9.Practical learner task.
  10. 10.Checkpoint or pause activity.
  11. 11.Common mistake and its correction.
  12. 12.Quality-control review.
  13. 13.Final recap.
  14. 14.Named learner deliverable.

Video requirements

  • Professional narration that is clear, natural and paced for instruction, synchronised with the screen action.
  • Authentic screen recording from the actual software, with visible menus, tools, panels, commands, settings and outputs.
  • Natural cursor movement and deliberate pacing, with a clear explanation of why each action is taken.
  • Realistic corrections and troubleshooting shown, not edited away.
  • Clear 16:9 screen capture.
  • Captions and a complete transcript.
  • Chapter titles and lesson sections.
  • A small presenter window only where useful; it never covers technical content and is hidden on mobile or dense technical screens.

Never produced as a lesson

  • Automated slideshows.
  • Generic screen tours.
  • Silent software demonstrations.
  • Marketing videos presented as lessons.
  • AI-avatar presentations.
  • Simulated software tutorials.
  • Fast montages without explanation.
  • An invented tutor, instructor identity, voice, recording, thumbnail or completion status.

Lessons use only synthetic, publicly licensed or Ideeplan-owned examples. No confidential client information is used.

No genuine professional recording exists yet. Until one does, every lesson remains “Video lesson: Not recorded — authentic professional recording required.” Enrolment, payments, certificates and protected learner access stay disabled during this production stage.

Professional narration and screen-first production

  • Every Academy lesson is planned as a professionally narrated, screen-led practical lesson with captions and a complete transcript.
  • No AI avatar, virtual presenter or artificial talking head is used, and no named person is imitated. No lesson is described as human-narrated, instructor-led by a named person or personally presented unless that is factually true.
  • No instructor identity is published until a real, named professional has recorded and approved the lesson.
  • Recordings are screen-first: the GIS view, planning drawing, AutoCAD or Revit workspace or document remains the main subject of the frame.
  • Any presenter picture-in-picture normally occupies about 8–10% of the frame, never covers technical content, and is reduced or hidden on small screens.
  • The Principal Consultant portrait is reserved for approved introductions and conclusions. It is never used as a repeated course thumbnail, and the Academy remains company-first.

No lesson has been recorded and no narration has been produced. Scripts exist as production plans only, and every lesson video status remains “Not recorded”.

Demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult. No confidential client file, unauthorised agency dataset or private project information is used.

Methods are jurisdiction-neutral. Learners must confirm local laws, policies and technical standards before applying them to a real project.

A production plan describes how a lesson would be recorded. It is not a recording, and it does not create an enrolment, account, payment or reserved place.

Course production standard

  • Recordings are screen-first: the planning drawing, GIS view, AutoCAD or Revit workspace stays the main subject of the frame.
  • Any presenter picture-in-picture normally occupies no more than about 8–10% of the frame and never covers maps, legends, drawings, dimensions or annotations.
  • On mobile and on dense technical screens the presenter window is reduced further or hidden entirely.
  • The Principal Consultant portrait is reserved for approved introductions, explanations and conclusions. It is not used as a generic thumbnail for every course.
  • Narration is planned for professional human delivery. No AI narration, AI presenter or recorded lesson exists today.

No lesson has been recorded. Every lesson media status is “Not recorded”.

Any example data used in teaching is synthetic, publicly licensed or owned by Ideeplan Consult, and is clearly labelled as demonstration data. No client file, confidential document or unauthorised project material is used.