Applied professional course
Development Access, Parking, Servicing and Circulation
Resolve how a site is entered, served, parked and moved through — at planning stage, before the layout is locked.
Written teaching content: available for review
Video lessons have not yet been recorded. Written teaching content may be available for review below.
Written teaching content only. This course is not yet available: it has not been professionally reviewed, no lesson is recorded, and enrolment, payment, certificates, downloads and protected access are all disabled.
Review Written Course ContentReading only. This is not enrolment, booking, purchase, account access, a download or protected learning access.
- Written content: Available for review
- Video lessons: Not recorded
- Professional review: Not yet completed
- Enrolment: Not available
- Payment: Disabled
- Certificates: Disabled
- Downloads: Disabled
- Protected access: Disabled
Written course content
Client-style brief
A mixed development of 220 homes, a small supermarket and a health centre has been refused in part because access, servicing and parking were unresolved. The highway authority raised visibility, refuse tracking, delivery conflict with the school run and unjustified parking provision. The team needs a coherent access and circulation strategy to support a resubmission.
Professional scenario
Synthetic 6.5-hectare site with a single frontage to a 40 mph classified road, a secondary frontage to a residential street with a school 180 metres away, an existing field access, a bus stop on the classified road and a level difference of four metres between the two frontages.
Planning problem
Access and servicing are frequently designed last, then defended with a tracking drawing produced after the layout is fixed. The professional problem is to derive the access, servicing and parking strategy from evidence and standards early, and to make it shape the layout rather than survive it.
Learning objectives
- Establish access options and test them against visibility, geometry, safety and network conditions.
- Design internal circulation for all users, including refuse, deliveries, emergency and service vehicles.
- Derive parking provision from evidence and policy rather than habit, including cycle and accessible parking.
- Resolve servicing and loading for non-residential uses without conflict with homes or the school.
- Present an access and circulation strategy that a highway authority can review.
Modules and lessons
0 of 9 lessons open
Module 1
Module 1 — Access options and appraisal
Decide where and how the site connects before any internal design.
Road classification, recorded speeds versus posted limits, junction spacing, existing accesses, collision record interpretation, and the difference between a network constraint and a design preference.
Practical exercise: Summarise the receiving network for both frontages and identify the constraints each imposes on an access.
Checkpoint: Every constraint cites a measurement or a supplied record.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Visibility splay principles and the inputs that determine them, priority junction versus roundabout versus simple access, gradient at the access, pedestrian and cycle crossing provision at the access, and what land control the splay requires.
Practical exercise: Test three access options for visibility and gradient and record what third-party land or vegetation removal each would need.
Checkpoint: Each option states its assumptions and the confirmation the highway authority would need to give.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Comparing options on safety, capacity, walkability, severance, deliverability and cost; the case for a second or emergency-only access; and writing a recommendation that acknowledges the residual risk.
Practical exercise: Complete the appraisal matrix and write the recommendation with its outstanding dependencies.
Checkpoint: The chosen option is justified against the refused scheme's specific criticisms.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Synthetic topographic survey, classified road speed and geometry data, a teaching collision record, school arrival and departure observations, and an Ideeplan-owned access appraisal template.
Module output: Access options plan and an appraisal recommending a preferred access strategy.
Module 2
Module 2 — Internal circulation and servicing
Make every vehicle that must reach a building able to do so safely.
Matching street type to function and vehicle load, turning heads and geometry, shared surface conditions and where they are inappropriate, and separating pedestrian and cycle movement from service routes where necessary.
Practical exercise: Set the internal hierarchy with carriageway widths, radii and turning provision, and mark every route a service vehicle must use.
Checkpoint: No dwelling or unit is beyond the reach of a required service vehicle.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Choosing correct design vehicles, tracking forward and reverse movements, the limits on reversing distance for refuse, kerb overrun and swept path clearance, and reading a tracking failure as a layout problem rather than a drawing problem.
Practical exercise: Track refuse, fire appliance and an articulated delivery through the layout and redesign the two junctions that fail.
Checkpoint: Every tracked path clears kerbs, street trees and parked positions.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Supermarket delivery frequency and vehicle size, dedicated service yards versus on-street loading, screening and noise for adjoining homes, refuse presentation and collection points, and scheduling deliveries away from school peak movements.
Practical exercise: Design the supermarket service yard and write the delivery management assumptions, including timing relative to the school peak.
Checkpoint: The servicing arrangement removes, rather than relocates, the recorded school-run conflict.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Draft internal layout, a teaching vehicle library including refuse, articulated delivery, fire appliance and ambulance, plus a synthetic supermarket delivery schedule.
Module output: Circulation plan, tracking drawings and a servicing strategy.
Module 3
Module 3 — Parking, evidence and presentation
Justify provision and present a reviewable strategy.
Standards as maximum, minimum or guideline; adjusting for accessibility and mix; visitor, accessible and cycle parking; electric vehicle provision; and the overspill consequences of getting provision wrong in either direction.
Practical exercise: Calculate provision for all three uses with a written justification per figure, including cycle and accessible spaces.
Checkpoint: Every number traces to a standard, an adjustment and a reason.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Distributing parking so it does not dominate frontage, bay dimensions and aisle widths, shared use between health centre and retail across different peaks, enforcement and management realities, and inclusive access from bay to entrance.
Practical exercise: Lay out the non-residential parking with a shared-use assessment across daily peaks.
Checkpoint: Accessible bays are the closest to entrances with a compliant surfaced route.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
What the authority reads first, drawing conventions and titles, presenting tracking clearly, listing assumptions and dependencies, and writing a document that answers the previous refusal reason by reason.
Practical exercise: Assemble the strategy with drawings, tracking, parking schedule, assumptions and a point-by-point response to the refusal reasons.
Checkpoint: Each refusal reason is answered with a drawing or paragraph reference.
Video lesson: Not recorded — written lesson above
Resource file not yet available. The written instructions on this page are complete and can be followed without any download.
Example data: Synthetic parking standards scenarios, an accessibility and bus frequency summary, and an Ideeplan-owned access strategy report template.
Module output: Parking strategy, drawing set and access and circulation strategy report.
Project brief
A synthetic 6.5-hectare mixed development site with a classified road frontage, a residential frontage near a school and a four-metre level difference.
Your role: Planning-side access and circulation lead preparing a resubmission strategy.
Information available
- Synthetic topographic survey and site layout.
- Classified road speed, geometry and teaching collision record.
- School arrival and departure observations.
- Teaching vehicle library and supermarket delivery schedule.
- Parking standards scenarios and the previous refusal reasons.
Required analysis
- Receiving network assessment for both frontages.
- Visibility and gradient testing of three access options.
- Vehicle tracking for refuse, fire and articulated delivery vehicles.
- Servicing conflict assessment against the school peak.
- Parking demand and provision calculation with shared-use testing.
Required outputs
- Access options and appraisal matrix.
- Internal circulation plan with dimensions.
- Tracking drawings for three design vehicles.
- Service yard design and delivery management assumptions.
- Parking schedule and the access and circulation strategy report.
Presentation standard: Scaled, titled drawings with dimensions and design vehicle named on every tracking sheet, and a report that lists assumptions and outstanding highway authority confirmations.
Marking criteria
- Evidence-based access choice: The preferred access is justified against measured constraints and the refusal reasons.
- Workable circulation: All required vehicles reach all required points without overrun or excessive reversing.
- Justified parking: Every provision figure traces to a standard and a stated adjustment.
- Conflict resolution: Servicing and school-peak conflicts are resolved rather than moved.
- Reviewability: A highway officer could assess the strategy without asking for missing information.
Quality-assurance checklist
- Design vehicles are named and their dimensions recorded on each tracking drawing.
- Visibility splays are shown on land within control or with the third-party requirement stated.
- Refuse reversing distances and collection points meet the stated standard.
- Accessible parking, cycle parking and electric vehicle provision are all itemised.
- Local highway design standards, visibility requirements, parking standards, refuse collection policy and emergency access requirements are confirmed with the relevant authority before the method is applied to a real site.
Common mistakes and correction tasks
- Tracking produced after the layout was fixed and shown only where it works. Correction: Track every service route, publish the failures and redesign the affected geometry.
- A visibility splay crossing land outside the applicant's control with no comment. Correction: State the third-party requirement or select an access option that avoids it.
- Parking provision copied from a previous scheme. Correction: Recalculate from the applicable standard with accessibility adjustments and record the basis.
- Supermarket deliveries scheduled through the school arrival peak. Correction: Reschedule the delivery window and record it as a management commitment.
Enrolment status
Enrolment is not currently available. This course is still undergoing content, media and professional review.
Register Interest is an expression of interest only. It works without an account, creates no enrolment, no reserved place and no payment order.
Protected lessons, approved videos and approved resource files are not accessible. No protected file URL, signed link or download entitlement is created.
Payments are disabled. No price, checkout, payment provider, payment order or paid-course claim exists in the Academy.
Outstanding before enrolment could open
- Outstanding — Professional content review is complete
- Outstanding — Required videos recorded, reviewed and approved, or the course approved as written-only
- Outstanding — Required practical resources approved and available
- Outstanding — Learner terms approved
- Outstanding — Privacy and data-handling requirements approved
- Outstanding — Course availability explicitly enabled by an authorised administrator
- Outstanding — Payment and refund terms approved (paid courses)
- Outstanding — Payment provider configuration complete (where payment is required)
- Outstanding — Authentication email delivery configured and tested
- Outstanding — Protected content access tested
- Outstanding — Approved delivery and support process in place
Progress, assessment and certificates
Submission access is not currently available
Lesson and course progress tracking is not active. No progress record, completion percentage or completed lesson exists for any account, and no course can record progress until enrolment opens.
Practical assessments cannot be submitted. Submission access is not currently available: there is no active enrolment, no upload configuration and no authorised reviewer workflow in operation.
No assessment has been marked, reviewed, corrected or passed. Reviewer feedback, correction tasks and pass decisions are made by an authorised human reviewer and none exists.
No certificate is issued, approved or pending. A future Academy certificate would be a course-completion certificate only — not a professional licence, statutory qualification, accreditation or government-recognised award.
Certificate verification is disabled until a certificate is genuinely issued. No verification result is produced for any reference.
Assessment formats planned for the Academy
Written briefs, required deliverables and marking criteria are published inside the course content above for open review. None of them can be submitted or marked at present.
- Practical planning task
- GIS mapping exercise
- Site-appraisal task
- Feasibility assessment
- CAD or drawing task
- Revit coordination task
- Planning-report task
- Policy-assessment task
- Transport or access analysis
- Environmental or green-infrastructure exercise
- Final course project
Outstanding before completion or a certificate could exist
- Outstanding — Learner identity verified by an authorised member of staff
- Outstanding — Learner holds a valid active or completed enrolment
- Outstanding — All required lessons completed
- Outstanding — All required practical assessments passed
- Outstanding — A recorded assessment decision exists for every required task
- Outstanding — All requested corrections completed
- Outstanding — Course content professionally reviewed and signed off
- Outstanding — Authorised reviewer has approved completion
- Outstanding — Course certificate policy approved
- Outstanding — Certificate wording approved by Ideeplan Consult
- Outstanding — Course is officially available
- Outstanding — Unique certificate numbering and a secure verification route configured
Practical resources
Resources for this course
13 resource records · 13 with a written preview · 0 with a file under preparation · Download access not yet enabled.
All demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult and is labelled as demonstration material. No confidential client file, personal information, private agency document or unreleased project drawing is used.
- Written preview available — downloadable file not yet available
Practical project brief
Sets the professional situation, the role the learner takes and what must be produced.
- Resource type
- Brief
- Format
- Written brief shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — One brief governs the whole course: every lesson exercise contributes to the same final deliverable.
- Access
- No account required — written preview is public
- A synthetic 6.5-hectare mixed development site with a classified road frontage, a residential frontage near a school and a four-metre level difference.
- Your role: Planning-side access and circulation lead preparing a resubmission strategy.
- Available information: Synthetic topographic survey and site layout.
- Available information: Classified road speed, geometry and teaching collision record.
- Available information: School arrival and departure observations.
- Available information: Teaching vehicle library and supermarket delivery schedule.
- Available information: Parking standards scenarios and the previous refusal reasons.
- Required analysis: Receiving network assessment for both frontages.
- Required analysis: Visibility and gradient testing of three access options.
- Required analysis: Vehicle tracking for refuse, fire and articulated delivery vehicles.
- Required analysis: Servicing conflict assessment against the school peak.
- Required analysis: Parking demand and provision calculation with shared-use testing.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Client-style instruction and problem statement
Gives the learner the instruction as a practitioner would receive it, and names the problem to be solved.
- Resource type
- Brief
- Format
- Written statement shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — Scenario framing applies to every lesson in the course.
- Access
- No account required — written preview is public
Synthetic 6.5-hectare site with a single frontage to a 40 mph classified road, a secondary frontage to a residential street with a school 180 metres away, an existing field access, a bus stop on the classified road and a level difference of four metres between the two frontages.
Access and servicing are frequently designed last, then defended with a tracking drawing produced after the layout is fixed. The professional problem is to derive the access, servicing and parking strategy from evidence and standards early, and to make it shape the layout rather than survive it.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 1 learner worksheet — Module 1 — Access options and appraisal
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access options plan and an appraisal recommending a preferred access strategy.
- Lessons supported
- 3 — Supports the 3 lessons in module 1, which build one shared output.
- Access
- No account required — written preview is public
- Understanding the receiving network — Summarise the receiving network for both frontages and identify the constraints each imposes on an access.
- Visibility, geometry and access form — Test three access options for visibility and gradient and record what third-party land or vegetation removal each would need.
- Appraising and choosing the access strategy — Complete the appraisal matrix and write the recommendation with its outstanding dependencies.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 2 learner worksheet — Module 2 — Internal circulation and servicing
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Circulation plan, tracking drawings and a servicing strategy.
- Lessons supported
- 3 — Supports the 3 lessons in module 2, which build one shared output.
- Access
- No account required — written preview is public
- Circulation hierarchy and shared surfaces — Set the internal hierarchy with carriageway widths, radii and turning provision, and mark every route a service vehicle must use.
- Vehicle tracking done properly — Track refuse, fire appliance and an articulated delivery through the layout and redesign the two junctions that fail.
- Servicing, loading and time conflicts — Design the supermarket service yard and write the delivery management assumptions, including timing relative to the school peak.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Module 3 learner worksheet — Module 3 — Parking, evidence and presentation
Lists the practical steps the learner carries out in this module, in order.
- Resource type
- Worksheet
- Format
- Written worksheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Parking strategy, drawing set and access and circulation strategy report.
- Lessons supported
- 3 — Supports the 3 lessons in module 3, which build one shared output.
- Access
- No account required — written preview is public
- Deriving parking provision from evidence — Calculate provision for all three uses with a written justification per figure, including cycle and accessible spaces.
- Parking layout, shared use and management — Lay out the non-residential parking with a shared-use assessment across daily peaks.
- Assembling a strategy the highway authority can review — Assemble the strategy with drawings, tracking, parking schedule, assumptions and a point-by-point response to the refusal reasons.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Task checklist
Confirms every required piece of work has been produced before submission.
- Resource type
- Checklist
- Format
- Written checklist shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — A single task checklist tracks progress across all modules.
- Access
- No account required — written preview is public
- Access options and appraisal matrix.
- Internal circulation plan with dimensions.
- Tracking drawings for three design vehicles.
- Service yard design and delivery management assumptions.
- Parking schedule and the access and circulation strategy report.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Example data and drawing base
Synthetic topographic survey, classified road speed and geometry data, a teaching collision record, school arrival and departure observations, and an Ideeplan-owned access appraisal template. GIS exercises are planned around plain, checkable formats: CSV and clearly labelled local-grid JSON on the named grid IDP-LOCAL-GRID. GeoJSON is not used for local-grid training data because the format asserts WGS 84 degrees. No QGIS project file, GeoPackage or raster file is claimed.
- Resource type
- GIS exercise pack
- Format
- CSV and local-grid JSON (planned) — no GeoJSON, QGIS project, GeoPackage or raster file is claimed
- Status
- Planned
- Data classification
- Synthetic demonstration data
- Licence or ownership
- Synthetic demonstration material prepared by Ideeplan Consult. No client file, personal information, private agency document or unreleased project drawing is used.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — One demonstration data base is used by every lesson so results stay comparable.
- Access
- No account required — written preview is public
Demonstration data item What it contains and how it is used Data ownership and licence Synthetic training data prepared and owned by Ideeplan Consult. It is fictional: it is not a real client project, a real site or a real location, and it must not be presented as one. Free to study on this page; redistribution is not permitted. Module 1 input — Module 1 — Access options and appraisal Synthetic topographic survey, classified road speed and geometry data, a teaching collision record, school arrival and departure observations, and an Ideeplan-owned access appraisal template. Module 2 input — Module 2 — Internal circulation and servicing Draft internal layout, a teaching vehicle library including refuse, articulated delivery, fire appliance and ambulance, plus a synthetic supermarket delivery schedule. Module 3 input — Module 3 — Parking, evidence and presentation Synthetic parking standards scenarios, an accessibility and bus frequency summary, and an Ideeplan-owned access strategy report template. Lawful sourcing where real data is substituted Where a learner substitutes real data, use only openly licensed or lawfully obtained sources, record the publisher, dataset title, version and access date, and cite them in the final deliverable. Do not use restricted, confidential or personal data. Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Analysis and calculation template
Structures the analysis so assumptions are visible and checkable. Any figures used in a template are teaching assumptions, not market evidence. Local costs, policies, standards and valuation assumptions must be independently confirmed before any of this is applied to a real project.
- Resource type
- Suitability matrix
- Format
- CSV matrix (planned)
- Status
- Planned
- Data classification
- Synthetic demonstration data
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — The same analysis structure is completed progressively through the course.
- Access
- No account required — written preview is public
- Record every assumption on its own labelled row, with the source or reason beside it.
- Module 1 working section — Access options plan and an appraisal recommending a preferred access strategy.
- Module 2 working section — Circulation plan, tracking drawings and a servicing strategy.
- Module 3 working section — Parking strategy, drawing set and access and circulation strategy report.
- Required output carried into the analysis — Access options and appraisal matrix.
- Required output carried into the analysis — Internal circulation plan with dimensions.
- Required output carried into the analysis — Tracking drawings for three design vehicles.
- Required output carried into the analysis — Service yard design and delivery management assumptions.
- Required output carried into the analysis — Parking schedule and the access and circulation strategy report.
- Check row: totals, units and areas reconcile before the result is carried into the deliverable.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Final deliverable template
Sets the expected structure and presentation standard for Access, Parking and Servicing Strategy with tracking drawings and parking schedule.
- Resource type
- Site plan base
- Format
- PDF and DXF (planned)
- Status
- Planned
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — The final deliverable draws on every module output.
- Access
- No account required — written preview is public
- Final named deliverable — Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Section 1 — Access options plan and an appraisal recommending a preferred access strategy.
- Section 2 — Circulation plan, tracking drawings and a servicing strategy.
- Section 3 — Parking strategy, drawing set and access and circulation strategy report.
- Must be present — Access options and appraisal matrix.
- Must be present — Internal circulation plan with dimensions.
- Must be present — Tracking drawings for three design vehicles.
- Must be present — Service yard design and delivery management assumptions.
- Must be present — Parking schedule and the access and circulation strategy report.
- Presentation and submission standard — Scaled, titled drawings with dimensions and design vehicle named on every tracking sheet, and a report that lists assumptions and outstanding highway authority confirmations.
- Sources and citations: list every dataset, publisher, version and access date used, and state clearly where synthetic Ideeplan training data was used.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Quality-control checklist
Professional checks to run before the work is treated as finished.
- Resource type
- Checklist
- Format
- Written checklist shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — Quality control is applied to the whole submission, not to a single lesson.
- Access
- No account required — written preview is public
- Design vehicles are named and their dimensions recorded on each tracking drawing.
- Visibility splays are shown on land within control or with the third-party requirement stated.
- Refuse reversing distances and collection points meet the stated standard.
- Accessible parking, cycle parking and electric vehicle provision are all itemised.
- Local highway design standards, visibility requirements, parking standards, refuse collection policy and emergency access requirements are confirmed with the relevant authority before the method is applied to a real site.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Marking and review rubric
States what a satisfactory professional standard looks like for each criterion.
- Resource type
- Marking rubric
- Format
- Written rubric shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — One rubric reviews the final deliverable produced across all modules.
- Access
- No account required — written preview is public
Criterion Satisfactory standard Evidence-based access choice The preferred access is justified against measured constraints and the refusal reasons. Workable circulation All required vehicles reach all required points without overrun or excessive reversing. Justified parking Every provision figure traces to a standard and a stated adjustment. Conflict resolution Servicing and school-peak conflicts are resolved rather than moved. Reviewability A highway officer could assess the strategy without asking for missing information. Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Correction-task sheet
Common professional mistakes and the correction the learner practises.
- Resource type
- Correction-task sheet
- Format
- Written task sheet shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — Correction tasks address mistakes that can appear anywhere in the course.
- Access
- No account required — written preview is public
- Tracking produced after the layout was fixed and shown only where it works. — Track every service route, publish the failures and redesign the affected geometry.
- A visibility splay crossing land outside the applicant's control with no comment. — State the third-party requirement or select an access option that avoids it.
- Parking provision copied from a previous scheme. — Recalculate from the applicable standard with accessibility adjustments and record the basis.
- Supermarket deliveries scheduled through the school arrival peak. — Reschedule the delivery window and record it as a management commitment.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
- Written preview available — downloadable file not yet available
Submission guidance
How the finished work should be assembled and presented for professional review.
- Resource type
- Checklist
- Format
- Written guidance shown on this page
- Status
- Draft
- Data classification
- Ideeplan-owned demonstration material
- Licence or ownership
- Ideeplan Consult-owned teaching material. Free to read on this page; redistribution is not permitted.
- Related deliverable
- Access, Parking and Servicing Strategy with tracking drawings and parking schedule
- Lessons supported
- 9 — Submission guidance covers the single final deliverable.
- Access
- No account required — written preview is public
Scaled, titled drawings with dimensions and design vehicle named on every tracking sheet, and a report that lists assumptions and outstanding highway authority confirmations.
Resource file not yet available. The written instructions on this page are complete and can be followed without any download, account, enrolment or payment.
Media status
Video lessons for this course
- Video lessons
- Video lesson: Not recorded — authentic professional recording required.
- Narration
- Professional narration — planned, not produced
- Captions
- Not yet produced
- Transcript
- Not yet produced
- Software demonstration
- Genuine screen capture from the real application only — no mockup, simulated interface or AI-generated screen.
- Software version and operating system
- No software version is published until it has been read from the actual recorded session. Until then the version reads “To be stated from the recorded session”.
- Production plan
- Prepared for professional review
- Enrolment, payment and downloads
- Disabled
Video lesson: Not recorded — authentic professional recording required. The written lesson on this page is complete and can be read in full without a video, an account, enrolment or payment.
Authentic software screen capture only — non-negotiable standard
Applies to every software demonstrated in the Academy, including AutoCAD, QGIS, Revit, ArcGIS, SketchUp, Lumion, Civil 3D, Rhino and any other software used. The final video must accurately represent what a learner sees when using the stated software version.
- Every demonstration is a genuine screen recording or screenshot captured from the actual installed software being taught.
- The exact software name, version, operating system and relevant workspace are stated on screen and in the lesson notes, as read from the recorded session.
- The real interface is shown: menus, panels, toolbars, properties, layer controls, settings and the command line or log.
- The real cursor, tool selection, commands, settings and the resulting output are visible.
- Capture is 16:9 and readable at 720p, with clear, unhurried cursor movement; the screen stays clear enough for learners to follow.
- The view zooms in whenever text, settings, coordinates or field values would otherwise be hard to read.
- The exact command, menu path or tool name is shown as it appears in the software.
- Useful keyboard shortcuts are shown alongside the menu path, never instead of it.
- Differences between software versions or operating systems are stated wherever the interface may display differently.
- Steps are numbered on screen, with callouts pointing at the actual control being used.
- Any annotation is added only after recording and must never alter or misrepresent the software interface.
- Captions and a complete transcript are produced before professional review.
- Any presenter window stays small, is positioned clear of technical content, and is hidden on mobile widths and on dense technical screens.
Interface visibility on every recording
- The full application interface is shown at the beginning of every demonstration, with the application identity and exact version clearly visible.
- The relevant menu bar, ribbon, toolbar or toolbox stays visible while each step is explained; the interface context is never cropped away.
- Layers, properties, project browser or data panels are shown wherever applicable.
- The command line, status bar or coordinate/CRS information is shown wherever relevant.
- Real cursor movement and visible clicks are captured, with visible cursor highlighting or click indicators.
- The selected tool and its effect are visible, and complete dialog boxes and settings are shown whenever one is opened.
- The resulting drawing, map, model or output is shown in the recording.
- Zoom is used only when necessary for small text or settings, always retaining enough context to identify the application and tool in use.
- The standard applies to every software course and is verified before any video is marked recorded or approved; if the required authentic interface is not visible, the lesson remains “Video lesson: Not recorded — authentic professional recording required.”
Never used
- Generic website mockups standing in for a software workspace.
- Simulated, redrawn, reconstructed or redesigned replica interfaces for any software.
- AI-generated software screens, panels, dialogs or map canvases.
- Generic illustrations replacing the real interface.
- Unverified screenshots taken from any source other than the recorded session.
- Fake video players, placeholder thumbnails or invented durations.
- Invented menus, tool names, command names, dialog options or keyboard shortcuts.
- Hiding important controls or covering them with a presenter window.
- Annotations that alter or misrepresent the recorded software interface.
- Claiming or implying that a simulated screen is an authentic software demonstration.
AutoCAD — what the recording must show
Exact AutoCAD release to be stated from the recorded session. Operating system to be stated from the recorded session; ribbon layout and shortcuts differ between Windows and Mac.
- 1.Drawing setup: new drawing, template choice and workspace.
- 2.Units: the UNITS dialog, unit type, precision and insertion scale.
- 3.Layers: the Layer Properties Manager, layer creation, colour, linetype and lineweight.
- 4.Object properties: the Properties palette and how an object's layer and overrides are read.
- 5.Commands: the command line with the exact command typed, including options and prompts.
- 6.Dimensions: dimension style settings and a dimension placed on real geometry.
- 7.Layouts: layout tabs, sheet size and page setup.
- 8.Viewports: viewport creation, scale setting and viewport locking.
- 9.Title blocks: title block insertion and completion of the sheet fields.
- 10.Plot settings: the PLOT dialog, plot style, paper size, scale and preview.
- 11.Final drawing checks: audit, purge, layer check and a measured check against the plotted scale.
QGIS — what the recording must show
Exact QGIS version to be stated from the recorded session. Operating system to be stated from the recorded session; menu positions and file dialogs differ between systems.
- 1.Project CRS: Project Properties, the CRS tab and the selected coordinate reference system.
- 2.Layer loading: the Data Source Manager or Browser panel and the layer added to the canvas.
- 3.Layer properties: the Layer Properties dialog and each tab used in the lesson.
- 4.Symbology: the Symbology tab with the real renderer, classes and colour settings.
- 5.Attribute tables: the attribute table, field values, selection and expression use.
- 6.Processing tools: the Processing Toolbox with the tool searched and opened by its real name.
- 7.Analysis settings: every parameter in the tool dialog, including output location.
- 8.Map layout: the Print Layout window, page setup and map item.
- 9.Legend, scale and north arrow: each item added from the real layout toolbar.
- 10.Export and quality checks: the export dialog settings and a check of the exported file.
No authentic software recording or screenshot exists yet. Every software lesson remains “Video lesson: Not recorded — authentic professional recording required.”
Real professional classroom experience — every lesson
Applies to every future Academy lesson, software-based or not. The finished lesson presents as authentic professional training, professionally narrated and screen-led: video + written guide + supporting data + practical task + quality checklist + final named deliverable.
Lesson structure
- 1.Professional introduction.
- 2.Realistic project situation.
- 3.Learner role within that situation.
- 4.Problem statement.
- 5.Learning objectives.
- 6.Required software and data.
- 7.Step-by-step demonstration.
- 8.Explanation of the professional reasoning behind each action.
- 9.Practical learner task.
- 10.Checkpoint or pause activity.
- 11.Common mistake and its correction.
- 12.Quality-control review.
- 13.Final recap.
- 14.Named learner deliverable.
Video requirements
- Professional narration that is clear, natural and paced for instruction, synchronised with the screen action.
- Authentic screen recording from the actual software, with visible menus, tools, panels, commands, settings and outputs.
- Natural cursor movement and deliberate pacing, with a clear explanation of why each action is taken.
- Realistic corrections and troubleshooting shown, not edited away.
- Clear 16:9 screen capture.
- Captions and a complete transcript.
- Chapter titles and lesson sections.
- A small presenter window only where useful; it never covers technical content and is hidden on mobile or dense technical screens.
Never produced as a lesson
- Automated slideshows.
- Generic screen tours.
- Silent software demonstrations.
- Marketing videos presented as lessons.
- AI-avatar presentations.
- Simulated software tutorials.
- Fast montages without explanation.
- An invented tutor, instructor identity, voice, recording, thumbnail or completion status.
Lessons use only synthetic, publicly licensed or Ideeplan-owned examples. No confidential client information is used.
No genuine professional recording exists yet. Until one does, every lesson remains “Video lesson: Not recorded — authentic professional recording required.” Enrolment, payments, certificates and protected learner access stay disabled during this production stage.
Professional narration and screen-first production
- Every Academy lesson is planned as a professionally narrated, screen-led practical lesson with captions and a complete transcript.
- No AI avatar, virtual presenter or artificial talking head is used, and no named person is imitated. No lesson is described as human-narrated, instructor-led by a named person or personally presented unless that is factually true.
- No instructor identity is published until a real, named professional has recorded and approved the lesson.
- Recordings are screen-first: the GIS view, planning drawing, AutoCAD or Revit workspace or document remains the main subject of the frame.
- Any presenter picture-in-picture normally occupies about 8–10% of the frame, never covers technical content, and is reduced or hidden on small screens.
- The Principal Consultant portrait is reserved for approved introductions and conclusions. It is never used as a repeated course thumbnail, and the Academy remains company-first.
No lesson has been recorded and no narration has been produced. Scripts exist as production plans only, and every lesson video status remains “Not recorded”.
Demonstration material is synthetic, publicly licensed or owned by Ideeplan Consult. No confidential client file, unauthorised agency dataset or private project information is used.
Methods are jurisdiction-neutral. Learners must confirm local laws, policies and technical standards before applying them to a real project.
A production plan describes how a lesson would be recorded. It is not a recording, and it does not create an enrolment, account, payment or reserved place.
9 lesson production plans · suggested recording time about 90 minutes in total (a planning estimate, not a recorded duration) · every lesson video status: Not recorded.
Lesson 1 · Video lesson: Not recorded — authentic professional recording required.
Understanding the receiving network
- Learning objective
- Road classification, recorded speeds versus posted limits, junction spacing, existing accesses, collision record interpretation, and the difference between a network constraint and a design preference.
- Narration focus
- Decide where and how the site connects before any internal design.
- Screen action
- Summarise the receiving network for both frontages and identify the constraints each imposes on an access.
- Required software
- AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software
- Example data
- Synthetic topographic survey, classified road speed and geometry data, a teaching collision record, school arrival and departure observations, and an Ideeplan-owned access appraisal template.
- Expected learner output
- Every constraint cites a measurement or a supplied record.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Road classification, recorded speeds versus posted limits, junction spacing, existing accesses, collision record interpretation, and the difference between a network constraint and a design preference.
- 2.Summarise the receiving network for both frontages and identify the constraints each imposes on an access.
- 3.Every constraint cites a measurement or a supplied record.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 2 · Video lesson: Not recorded — authentic professional recording required.
Visibility, geometry and access form
- Learning objective
- Visibility splay principles and the inputs that determine them, priority junction versus roundabout versus simple access, gradient at the access, pedestrian and cycle crossing provision at the access, and what land control the splay requires.
- Narration focus
- Decide where and how the site connects before any internal design.
- Screen action
- Test three access options for visibility and gradient and record what third-party land or vegetation removal each would need.
- Required software
- AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software
- Example data
- Synthetic topographic survey, classified road speed and geometry data, a teaching collision record, school arrival and departure observations, and an Ideeplan-owned access appraisal template.
- Expected learner output
- Each option states its assumptions and the confirmation the highway authority would need to give.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Visibility splay principles and the inputs that determine them, priority junction versus roundabout versus simple access, gradient at the access, pedestrian and cycle crossing provision at the access, and what land control the splay requires.
- 2.Test three access options for visibility and gradient and record what third-party land or vegetation removal each would need.
- 3.Each option states its assumptions and the confirmation the highway authority would need to give.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 3 · Video lesson: Not recorded — authentic professional recording required.
Appraising and choosing the access strategy
- Learning objective
- Comparing options on safety, capacity, walkability, severance, deliverability and cost; the case for a second or emergency-only access; and writing a recommendation that acknowledges the residual risk.
- Narration focus
- Decide where and how the site connects before any internal design.
- Screen action
- Complete the appraisal matrix and write the recommendation with its outstanding dependencies.
- Required software
- AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software
- Example data
- Synthetic topographic survey, classified road speed and geometry data, a teaching collision record, school arrival and departure observations, and an Ideeplan-owned access appraisal template.
- Expected learner output
- The chosen option is justified against the refused scheme's specific criticisms.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Comparing options on safety, capacity, walkability, severance, deliverability and cost; the case for a second or emergency-only access; and writing a recommendation that acknowledges the residual risk.
- 2.Complete the appraisal matrix and write the recommendation with its outstanding dependencies.
- 3.The chosen option is justified against the refused scheme's specific criticisms.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 4 · Video lesson: Not recorded — authentic professional recording required.
Circulation hierarchy and shared surfaces
- Learning objective
- Matching street type to function and vehicle load, turning heads and geometry, shared surface conditions and where they are inappropriate, and separating pedestrian and cycle movement from service routes where necessary.
- Narration focus
- Make every vehicle that must reach a building able to do so safely.
- Screen action
- Set the internal hierarchy with carriageway widths, radii and turning provision, and mark every route a service vehicle must use.
- Required software
- AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software
- Example data
- Draft internal layout, a teaching vehicle library including refuse, articulated delivery, fire appliance and ambulance, plus a synthetic supermarket delivery schedule.
- Expected learner output
- No dwelling or unit is beyond the reach of a required service vehicle.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Matching street type to function and vehicle load, turning heads and geometry, shared surface conditions and where they are inappropriate, and separating pedestrian and cycle movement from service routes where necessary.
- 2.Set the internal hierarchy with carriageway widths, radii and turning provision, and mark every route a service vehicle must use.
- 3.No dwelling or unit is beyond the reach of a required service vehicle.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 5 · Video lesson: Not recorded — authentic professional recording required.
Vehicle tracking done properly
- Learning objective
- Choosing correct design vehicles, tracking forward and reverse movements, the limits on reversing distance for refuse, kerb overrun and swept path clearance, and reading a tracking failure as a layout problem rather than a drawing problem.
- Narration focus
- Make every vehicle that must reach a building able to do so safely.
- Screen action
- Track refuse, fire appliance and an articulated delivery through the layout and redesign the two junctions that fail.
- Required software
- AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software
- Example data
- Draft internal layout, a teaching vehicle library including refuse, articulated delivery, fire appliance and ambulance, plus a synthetic supermarket delivery schedule.
- Expected learner output
- Every tracked path clears kerbs, street trees and parked positions.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Choosing correct design vehicles, tracking forward and reverse movements, the limits on reversing distance for refuse, kerb overrun and swept path clearance, and reading a tracking failure as a layout problem rather than a drawing problem.
- 2.Track refuse, fire appliance and an articulated delivery through the layout and redesign the two junctions that fail.
- 3.Every tracked path clears kerbs, street trees and parked positions.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 6 · Video lesson: Not recorded — authentic professional recording required.
Servicing, loading and time conflicts
- Learning objective
- Supermarket delivery frequency and vehicle size, dedicated service yards versus on-street loading, screening and noise for adjoining homes, refuse presentation and collection points, and scheduling deliveries away from school peak movements.
- Narration focus
- Make every vehicle that must reach a building able to do so safely.
- Screen action
- Design the supermarket service yard and write the delivery management assumptions, including timing relative to the school peak.
- Required software
- AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software
- Example data
- Draft internal layout, a teaching vehicle library including refuse, articulated delivery, fire appliance and ambulance, plus a synthetic supermarket delivery schedule.
- Expected learner output
- The servicing arrangement removes, rather than relocates, the recorded school-run conflict.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Supermarket delivery frequency and vehicle size, dedicated service yards versus on-street loading, screening and noise for adjoining homes, refuse presentation and collection points, and scheduling deliveries away from school peak movements.
- 2.Design the supermarket service yard and write the delivery management assumptions, including timing relative to the school peak.
- 3.The servicing arrangement removes, rather than relocates, the recorded school-run conflict.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 7 · Video lesson: Not recorded — authentic professional recording required.
Deriving parking provision from evidence
- Learning objective
- Standards as maximum, minimum or guideline; adjusting for accessibility and mix; visitor, accessible and cycle parking; electric vehicle provision; and the overspill consequences of getting provision wrong in either direction.
- Narration focus
- Justify provision and present a reviewable strategy.
- Screen action
- Calculate provision for all three uses with a written justification per figure, including cycle and accessible spaces.
- Required software
- AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software
- Example data
- Synthetic parking standards scenarios, an accessibility and bus frequency summary, and an Ideeplan-owned access strategy report template.
- Expected learner output
- Every number traces to a standard, an adjustment and a reason.
- Suggested length
- About 8 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Standards as maximum, minimum or guideline; adjusting for accessibility and mix; visitor, accessible and cycle parking; electric vehicle provision; and the overspill consequences of getting provision wrong in either direction.
- 2.Calculate provision for all three uses with a written justification per figure, including cycle and accessible spaces.
- 3.Every number traces to a standard, an adjustment and a reason.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 8 · Video lesson: Not recorded — authentic professional recording required.
Parking layout, shared use and management
- Learning objective
- Distributing parking so it does not dominate frontage, bay dimensions and aisle widths, shared use between health centre and retail across different peaks, enforcement and management realities, and inclusive access from bay to entrance.
- Narration focus
- Justify provision and present a reviewable strategy.
- Screen action
- Lay out the non-residential parking with a shared-use assessment across daily peaks.
- Required software
- AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software
- Example data
- Synthetic parking standards scenarios, an accessibility and bus frequency summary, and an Ideeplan-owned access strategy report template.
- Expected learner output
- Accessible bays are the closest to entrances with a compliant surfaced route.
- Suggested length
- About 10 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.Distributing parking so it does not dominate frontage, bay dimensions and aisle widths, shared use between health centre and retail across different peaks, enforcement and management realities, and inclusive access from bay to entrance.
- 2.Lay out the non-residential parking with a shared-use assessment across daily peaks.
- 3.Accessible bays are the closest to entrances with a compliant surfaced route.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Lesson 9 · Video lesson: Not recorded — authentic professional recording required.
Assembling a strategy the highway authority can review
- Learning objective
- What the authority reads first, drawing conventions and titles, presenting tracking clearly, listing assumptions and dependencies, and writing a document that answers the previous refusal reason by reason.
- Narration focus
- Justify provision and present a reviewable strategy.
- Screen action
- Assemble the strategy with drawings, tracking, parking schedule, assumptions and a point-by-point response to the refusal reasons.
- Required software
- AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software
- Example data
- Synthetic parking standards scenarios, an accessibility and bus frequency summary, and an Ideeplan-owned access strategy report template.
- Expected learner output
- Each refusal reason is answered with a drawing or paragraph reference.
- Suggested length
- About 12 minutes (planning estimate)
- Captions and transcript
- Required before professional review
- Narration
- Professional narration — not yet produced
Demonstration sequence
- 1.What the authority reads first, drawing conventions and titles, presenting tracking clearly, listing assumptions and dependencies, and writing a document that answers the previous refusal reason by reason.
- 2.Assemble the strategy with drawings, tracking, parking schedule, assumptions and a point-by-point response to the refusal reasons.
- 3.Each refusal reason is answered with a drawing or paragraph reference.
Quality review checklist
- Technical content (map, drawing, model or document) fills the majority of the frame and stays legible at 720p.
- Presenter picture-in-picture, if used, stays at roughly 8–10% of the frame, never covers legends, dimensions, labels or annotations, and is hidden on mobile widths and dense technical screens.
- Software shown is limited to AutoCAD or equivalent CAD, Vehicle tracking software, QGIS, Spreadsheet software, with no suggestion of provider endorsement.
- Capture is a genuine screen recording from the real application — no mockup, simulated interface, AI-generated screen or unverified screenshot.
- The exact software name, version and, where relevant, operating system are read from the recorded session and stated on screen.
- Menus, panels, toolbars, layer controls and the command line or log are visible and legible; the view zooms in wherever text, settings or coordinates would be hard to read.
- The full application interface is shown at the beginning; menus, tools and panels stay visible throughout and the interface context is never cropped away, with zoom retaining enough context to identify the application and tool.
- Real cursor movement with visible highlighting or click indicators is captured; the selected tool, its effect, complete dialogs and the resulting output are all shown.
- The exact command, menu path or tool name is shown as it appears in the software, with useful keyboard shortcuts alongside it and alternative locations explained for other versions.
- Numbered on-screen steps and callouts point at the real controls being used; no menu, tool or command is invented.
- Until an authentic recording exists the lesson reads: “Video lesson: Not recorded — authentic professional recording required.”
- All data on screen is synthetic, publicly licensed or Ideeplan-owned, and is labelled as demonstration data.
- Narration states that methods are jurisdiction-neutral and that local laws, policies and standards must be confirmed.
- Captions and a transcript are produced before the recording can move to professional review.
- No client name, confidential file or private project information appears on screen at any point.
Course production standard
- Recordings are screen-first: the planning drawing, GIS view, AutoCAD or Revit workspace stays the main subject of the frame.
- Any presenter picture-in-picture normally occupies no more than about 8–10% of the frame and never covers maps, legends, drawings, dimensions or annotations.
- On mobile and on dense technical screens the presenter window is reduced further or hidden entirely.
- The Principal Consultant portrait is reserved for approved introductions, explanations and conclusions. It is not used as a generic thumbnail for every course.
- Narration is planned for professional human delivery. No AI narration, AI presenter or recorded lesson exists today.
No lesson has been recorded. Every lesson media status is “Not recorded”.
Any example data used in teaching is synthetic, publicly licensed or owned by Ideeplan Consult, and is clearly labelled as demonstration data. No client file, confidential document or unauthorised project material is used.
Want this course finished first?
Registering interest is not an enrolment. It tells Ideeplan Consult which subjects to complete and review first.